Ein Jahrzehnt hervorragende Bauleistungen
Angesichts der kontinuierlichen technologischen Innovation im Bauwesen wurden bei folgenden Projekten neue Konzepte und Möglichkeiten genutzt, um multidisziplinäre Teams über den gesamten Projektlebenszyklus hinweg zu vernetzen und so besser, schneller und nachhaltiger zu bauen. Erfahren Sie mehr darüber!

USA, 2020 AEC Excellence Winner
Georgia Institute of Technology, Kendeda Building for Innovative Sustainable Design
Skanska USA
"No matter the type or size of project, BIM can help you achieve
sustainability goals. Always think about the opportunities not
to waste, even in terms of becoming a paperless project.”
–– Jimmy Mitchell, Director of Project Solutions, Skanska USA
H I G H L I G H T S
Higher Education The 36,978-sq. ft. sustainable urban structure includes a 170-person
auditorium, classrooms, and maker spaces. It also features a green roof,
solar panel canopy, cisterns for rainwater collection and reuse, and
integrated plantings to provide food for students throughout the year.
P R O J E C T
Proving Net-Positive in Hot Climates The education and research facility was designed and built to the
rigorous sustainability guidelines of the International Living
Future Institute’s Living Building Challenge 3.1 standard and
LEED Platinum, showing that regenerative, sustainable buildings
are viable in the South.
O U T C O M E
I N T H E I R O W N W O R D S
Image courtesy of Jonathan Hillyer
The project INCLUDES 90–100% SALVAGED MATERIALS.
The building GENERATES at least 105% of its ENERGY needs.
It’s THE FIRST FULLY CERTIFIED Living Building in GEORGIA.
United Kingdom, 2019 AEC Excellence Winner
E03 Canada Court and E05 Quebec, Wembley Park John Sisk & Son
—— James Burt, Quintain (client)
“Digital Project Delivery is an excellent approach for delivery processes, and we look to work with our construction partners
to enhance the use of these. To reduce risk, improve delivery, and learn how to build better.”
H I G H L I G H T S
Urban and Rural Planning The complex build-to-rent residential project includes
ten buildings that are divided among two blocks. The
buildings range from 12-26 stories, have 1,200 apartments,
and are linked on the ground by a podium-level garden.
P R O J E C T
An Innovative Site Management Solution Key construction workflows were digitized by linking project data to
“digital smart containers” via QR codes, creating a single source of
information for efficiently coordinating design and site activities
and avoiding costly rework for delivery ahead of schedule.
O U T C O M E
I N T H E I R O W N W O R D S
SAVED £90K of concrete rework through enhanced clash detection.
REALIZED 35% TIME SAVINGS with digitized QA/QC processes.
The first apartment block was DELIVERED 25 DAYS AHEAD OF SCHEDULE.
Image courtesy of John Sisk & Son
—— Paddy Ryan, BIM Lead, Mace Group
"You can have the best technology, but it doesn’t really do much good
unless you have backing from the whole team. From the client to the trades,
everyone on the project bought into the use of BIM and cloud technology.
Now, it’s hard to imagine doing a project like this any other way.”
I N T H E I R O W N W O R D S
Ireland, 2018 AEC Excellence Winner
Clonee Facebook Data Centre Mace Group
H I G H L I G H T S
Data Center The pair of 25,500-sq. ft. complex buildings that house
eight data halls were designed to support social media apps
and services to 1.04 billion daily active users.
P R O J E C T
Integrating Teams with Collaboration Tools By adopting lean, integrated workflows, the extended project team
of as many as 1,500 people could coordinate in real time for
improved productivity, increased quality, and faster delivery.
O U T C O M E
Image courtesy of Mace Group
Powered by 100% RENEWABLE ENERGY.
REDUCED time spent on model management by 97%.
INCREASED PRODUCTIVITY by 35% with digital workflows.
—— Yawu Su, Project Manager, China Construction Eighth Engineering Division Corp., Ltd.
“Only by using BIM and the latest technologies throughout the entire
construction process can we finish a building 530 meters in height
in five years. BIM has not only changed the way we work but also
clarifies how we think about and meet new challenges.”
H I G H L I G H T S
Financial The striking new 390,000-sq. m. landmark integrates
business and commercial space, luxury apartments,
and a five-star hotel into the 103-story tower, reaching
a total height of 530 meters.
P R O J E C T
BIM from the Beginning Connecting all employees, specialties, and processes, BIM was
used from project start through delivery and ongoing operational
maintenance of a complex building design with precise as-built
production, zero reworks, and no storage on the construction site.
O U T C O M E
I N T H E I R O W N W O R D S
China, 2017 AEC Excellence Winner
Tianjin Chow Tai Fook Financial Center Project China Construction Eighth Engineering Division Corp., Ltd.
184,504 MODELS were tracked through project completion.
SAVED $14M RMB in material and labor costs.
2,950 QR CODES were used to track equipment and prefabrication components.
Image courtesy of China Construction Eighth Engineering Division Corp., Ltd.
—— Yan Bin, Chief Engineer, China Construction Third Engineering Bureau Group Co., Ltd.
“Using sensors and devices connected to the cloud, we monitor building components’ structural integrity, track
the temperature of concrete pours, and learn the location of personnel and materials. All that data gets pushed
to the cloud in real time. The result? A more efficient project and a higher-quality building.”
H I G H L I G H T S
Offices Located in China’s Silicon Valley on land reclaimed from the
sea, the huge 1.6 million-sq. ft. building is home to the maker
of the popular QQ and WeChat messaging apps and includes
research labs, offices, parking, a bus station, health and gym
facilities, and building-wide IoT smart features.
P R O J E C T
Making Sites Safer, More Productive By embracing BIM and IoT, the entire project lifecycle was
connected to better measure, manage, and monitor project
delivery, driving efficient collaboration and increased safety
and quality for a seamless handoff.
O U T C O M E
I N T H E I R O W N W O R D S
China, 2016 AEC Excellence Winner
Tencent Beijing Headquarters China Construction Third Engineering Bureau Group Co., Ltd.
THREE BRIDGE LAYERS with shared facilities CONNECT TWO TOWERS.
REDUCED cost by $100M with BIM.
SHORTENED project schedule by 3 MONTHS.
Image courtesy of China Construction Third Engineering Bureau Group Co., Ltd.
Celebrating innovators like you Industry excellence has a unique way of inspiring us to make the new possible. Discover many more incredible achievements over the decade made possible with Autodesk.
Explore more AEC Excellence
Celebrating a decade of construction excellence
With continued technological innovation happening across construction, these projects used new concepts and capabilities to connect multidisciplinary teams
across the project lifecycle to build better, faster, and more sustainably.
https://www.autodesk.com/solutions/architecture-engineering-construction/aec-excellence-awards/sustainability-innovation-2020 https://excellenceawards.autodesk.com/projects/?i=e03-e05-wembley&TB_iframe=true&width=370.8&height=658.8 https://adskconstruction.autodesk.com/acc-ireland/mace-uses-bim360-for-facebook-data-centre https://www.autodesk.com/solutions/bim/hub/aec-excellence-2017/construction/first-place https://www.autodesk.com/solutions/bim/hub/2016-entry-441 https://www.autodesk.com/solutions/architecture-engineering-construction/aec-excellence-awards