Unleashing the Full Potential of Rail Assets delivery with range of Autodesk Solutions | Presentation
Download the full presentation now.

MAKE THE FUTURE OF RAIL
© 2024 Autodesk. All rights reserved.
Unleashing the full potential of Rail Assets Delivery with full range of Autodesk products
Agenda example
1 Introduction
2 Creating the Digital Continuum
3 Asset Register & Information requirements
4 Project Digital Model creation & validation
5 Asset Digital Model creation & validation
6 Specific use Cases : Safety & Carbon calculation
Bonus:
RA IL SUMMI T 20 24
Who we are?
Committed
to innovation and cutting-
edge
solutions
1 of 2 HSL
50% of
WW metro
WE ARE Digital Engineering Experts in
Mobility
11,500 People
160 digital production managers
1200 BIM modelers A Pure Player in rail transport
committed to OPEN BIM creation of the IFC Rail standards
BIM
trasformation
sice 2013
https://systra.com/
RA IL SUMMI T 20 24
DIGITAL ENGINEERING SERVICES
(France, Australia, Poland, Dubai…)
Strategy & Vision for Innovation & Transformation,
Development of services and New solutions around Digital Engineering.
Who we are?
RA IL SUMMI T 20 24
Autodesk Rail
Summit 2019
Autodesk Rail
Summit 2022
Autodesk
University 2022
Autodesk
University 2024
Vladana
DARRAS
BLATNIK
Digital Engineering
Expert
at SYSTRA SA
Corporate office
RA IL SUMMI T 20 24
Creating Digital Continuum
RA IL SUMMI T 20 24
Create Digital
Information Model
Asset Data
Design Data
Construction Data
Asset
Information Model
Build your
Asset register
Establish your
project requirements
AIR
PIR
PIM (+AIM) AIM
Creating the Digital Continuum
As Build register
Specification on Needs Delivery of Information Acceptance
Delivery
Asset
Information Model
CMMS
O&M
1
2
3 5
4
RA IL SUMMI T 20 24
Build your Asset
register
1
RA IL SUMMI T 20 24
Build your Asset
register
1
RA IL SUMMI T 20 24
RA IL SUMMI T 20 24
Create Digital
Information Model
Asset Data
Design Data
Construction Data
Asset
Information Model
Build your
Asset register
Establish your
project requirements
AIR
PIR
PIM (+AIM) AIM
Creating the Digital Continuum
As Build register
Specification on Needs Delivery of Information Acceptance
Delivery
Asset
Information Model
CMMS
O&M
1
2
3 5
4
RA IL SUMMI T 20 24
Object Register
Establish Project Data requirements
Define your
project requirements
Project Content Catalogue
Global storage of Information
▪ Graphical ▪ Non-graphical
▪ Production Standard
Model Production
Delivery Matrix
▪ Classification
▪ Data Dictionary
Poject specific Data set up with :
▪ List of Objects
▪ Graphical and non-graphical level of detail
▪ Other Modelling requirements
2
RA IL SUMMI T 20 24
Content Catalog
Object Register
BIM Content Catalog
Object Register
Object Register
BIM Content Catalog
RA IL SUMMI T 20 24
Create Digital
Information Model
Asset Data
Design Data
Construction Data
Asset
Information Model
Build your
Asset register
Establish your
project requirements
AIR
PIR
PIM (+AIM) AIM
Creating the Digital Continuum
As Build register
Specification on Needs Delivery of Information Acceptance
Delivery
Asset
Information Model
CMMS
O&M
1
2
3 5
4
RA IL SUMMI T 20 24
Create Project Digital Model
3
RA IL SUMMI T 20 24
RA IL SUMMI T 20 24
Create Digital
Information Model
Asset Data
Design Data
Construction Data
Asset
Information Model
Build your
Asset register
Establish your
project requirements
AIR
PIR
PIM (+AIM) AIM
Creating the Digital Continuum
As Build register
Specification on Needs Delivery of Information Acceptance
Delivery
Asset
Information Model
CMMS
O&M
1
2
3 5
4
RA IL SUMMI T 20 24
Control & Validate your PIM Data
4
View non-conformities on models easily and accurately for effective production management
Trust your BIM data
eLODy: the web platform which analyses, monitors and secures the data for your BIM models
Improved design quality Automation of the verification process 40 à 60 % reduction in checking time Standardisation of models and implementation of the OpenBIM process using the IFC (ISO 16739) and BCF formats. Compatible with over 60 formats
Create your monitoring rules
and automate checks for supply chain production.
RA IL SUMMI T 20 24
RA IL SUMMI T 20 24
Create Digital
Information Model
Asset Data
Design Data
Construction Data
Asset
Information Model
Build your
Asset register
Establish your
project requirements
AIR
PIR
PIM (+AIM) AIM
Creating the Digital Continuum
As Build register
Specification on Needs Delivery of Information Acceptance
Delivery
Asset
Information Model
CMMS
O&M
1
2
3 5
4
4
RA IL SUMMI T 20 24
Use BIM data to build your Asset Information Model
5
Build BIM data for AIM.
RA IL SUMMI T 20 24
Create Digital
Information Model
Asset Data
Design Data
Construction Data
Asset
Information Model
Build your
Asset register
Define your
project requirements
AIR
PIR
PIM AIM
Creating the Digital Continuum
As Build register
Assessment & Need Delivery of Information Acceptance
Asset
Information Model
CMMS
O&MDelivery
Safety Sustainability
RA IL SUMMI T 20 24
BONUS
RA IL SUMMI T 20 24
Manage your SAFETY risk – Safe by Design
• Taking into account of international standards
• Workflow management
1 Customisation • Centralised database • Real-time access to all teams • Management of users and roles • Contextualise risks in BIM models
• Dashboard with project statistics • Detailed overview of all risks • 3D visualisation of geolocated
risks
Management of risks throughout their life cycle integrating: • archiving of all changes • role-based Workflows
2 Collaboration 3 Visualisation 4 Traceability
RA IL SUMMI T 20 24
2021 - Optimise your project carbon footprint MESURE MANAGE CONTROL carbon emissions at every stage of your Rail project
• A multi-level analysis of emissions for review of carbon reduction opportunities
• Compare the carbon footprint of different assets for any lifecycle stage to identify hotspots and optimise design
• A database based on SYSTRA’s technical expertise and recognized international data sources.
• Carbon calculation methodology compliant to ISO 14040, ISO 14044, EN 15978 and supports the PAS 2080 certification
• Emissions assessed for the whole project lifecycle • Possibility to capture BIM and non-BIM data
RA IL SUMMI T 20 24
Thank you!
Digital Engineering Expert, SYSTRA Group
Vladana DARRAS
https://systra.com/
Digital solutions
Rail Summit 2024 Presentation Folie 1: Unleashing the full potential of Rail Assets Delivery with full range of Autodesk products Folie 2: Agenda example Folie 3: Who we are? Folie 4 Folie 5 Folie 6 Folie 7 Folie 8 Folie 9 Folie 10 Folie 11 Folie 12: Establish Project Data requirements Folie 13 Folie 14 Folie 15: Create Project Digital Model Folie 16 Folie 17 Folie 18: Control & Validate your PIM Data Folie 19 Folie 20 Folie 21 Folie 22 Folie 23 Folie 24 Folie 25: 2021 - Optimise your project carbon footprint Folie 26 Folie 27: Thank you!