Next Stop: Sound Transit Advancing Rail Through Digital Innovation in Seattle, Washington | Presentation

© 2025 Autodesk. All rights reserved.
Advancing Rail Through Digital Innovation in Seattle, Washington
Next Stop: Sound Transit
2
Speakers
Justin Lopez
Deputy Director, AEC Technology
Sound Transit
Jay Mezher, AIA
Vice President | Digital Delivery
Mott MacDonald
Agenda
Image courtesy of Sound Transit
00
01
02
04
Departure Station: New Tracks Ahead
Data Central: CDE Foundations
Reality Checkpoint: Existing Data
Engagement Square: Visualization
05
06
Handover Terminal: Digital As-Builts / Records
Innovation Platform: AI Pilot Program / Innovation
03 Design Junction: Model Based Design
07 Destination: Digital Twin
Departure Station
New Tracks Ahead Challenges & Opportunities
Sound Move (Completion 2009)
2D CAD
$3.9 Billion
20.35 mi (32.75 km), 14 Stations
ST2 2008 (Completion ~2025)
CAD, BIM, GIS, LiDAR
$7.9 Billion
38.4 mi (61.79 km), 26 Stations
ST3 2016 (Completion ~2045)
Full BIM, CDE, VR, AI, EAM, Digital Twins
$60 Billion
62 mi (99.7 km), 29 Stations
Phases of Sound Transit Expansion
Sound Transit Project Types
Sound Transit Project Types
Sound Transit Project Types
I-90 Floating Bridge – An engineering first!
I-90 Floating Bridge
State of the Possible – Past and Future
Late 1900’s
1993 - Sound Transit is created
AutoCAD 2D is the standard platform
2000’s
BIM adoption by AEC industry
AEC sector begins to code
Software Solutions
2012 – ST BIM Adoption for Facilities
2020’s
2025 – More Model based design
Common Data Environment (CDE)
Machine Learning, Deep Learning & Large Language models (AI)
2030’s and beyond
Exponential Growth in information
• “96% of Engineering and Construction data is unused”
• “13% of working hours spent looking for project data”
• “Applications are not integrated with one another”
-Big Data = Big Questions for Engineering and construction industry FMI – White Paper
• 2030’s and beyond
Exponential Growth in information
State of the Possible – Past and Future
Station 1
Data Central CDE Foundations
Previous
Proposed
Contractor/ Designer Sound Transit ACC
ACC Bridge
Automated & Synchronised File Sharing
Location: Specific
Pathway
Location: Specific
Pathway
Status: Shared Status: Shared
BIM Models BIM Models
BIM Models
Manual handling of files Huge file downloads (incl. ref files)
Zipping + unzipping of files
Manual handling of files Huge file downloads (incl. ref files)
Zipping + unzipping of files
IM Process Evolution
Contractor/ Designer Sound Transit ACCSharePoint
Sound Transit CDE (Autodesk Construction Cloud)
15
Contract
Package 1
Contract
Package 2
Contract
Package 3
Contract
Package 4
Contract
Package 5
Contract
Package 6
Contract
Package 7
Contract
Package 8
Contract
Package 1
Contract
Package 2
Contract
Package 3
Contract
Package 4
Contract
Package 5
Contract
Package 6
Contract
Package 7
Contract
Package 8
View Shared Published
Project Master ACC | Record Models
Sound Transit Hub Master Projects
Sound Transit Hub Connector Projects
Contractors’ Hub Design & Construction Projects
Data analytics dashboards
Project Data Hub
• One-stop hub for all project members to
• access and search for
project data
• Dashboards by discipline
• Single location
• Consistency + Access Control
Station 2 Reality Checkpoint Existing Data
Geotechnical Sub-Surface Modeling
TDEM Drone MCGPR
Utility Mapping & Scanning
Sub surface
Utility Scans
Earlier
investigations
Minimize invasive
potholing
Minimize risk
2 corridors
Pilot Program
Utility Mapping & Scanning
Sub surface
Utility Scans
Earlier
investigations
Minimize invasive
potholing
Minimize risk
2 corridors
Pilot Program
Image courtesy Exodigo
Reality Capture – LIDAR Scanning Downtown Sound
Transit Tunnel
LIDAR Scanning
New approaches to
record models
Accurate final
conditions + BIM
overlays
Reality Capture – 360 Photos
Station 3 Design Junction Model Based Design
Building Information Modeling
26
Model Based Design - BIM
• Immersive ‘Digital Lab’
• Enable a full digital experience
• Dedicated space on campus
Digital Lab – Immersive Space
29
Station 4 Engagement Square Visualization
INTEGRATED
MODEL
DIGITAL MODELLING FRAMEWORK
EXISTING
MODELS ARCHITECTURAL
MODELS
CIVIL
MODELS
CONSTRUCTION
SCHEDULE UTILITIES +
GEOTECHNICAL
TRAFFIC &
PEDESTRIAN MODELS
CONSTRUCTION
DRAWINGS
COORDINATED
DESIGN
QUANTITY TAKEOFF
ESTIMATING VISUALIZATION 4D
MODELS
COST LOADED
MODELS
DIGITAL
TWIN
AS-BUILT/RECORDS
MODELS
INTEGRATED
MODEL
DIGITAL MODELLING FRAMEWORK
EXISTING
MODELS ARCHITECTURAL
MODELS
CIVIL
MODELS
CONSTRUCTION
SCHEDULE UTILITIES +
GEOTECHNICAL
TRAFFIC &
PEDESTRIAN MODELS
CONSTRUCTION
DRAWINGS
COORDINATED
DESIGN
QUANTITY TAKEOFF
ESTIMATING
4D
MODELS
COST LOADED
MODELS
DIGITAL
TWIN
AS-BUILT/RECORDS
MODELS VISUALIZATION
INTEGRATED
MODEL
CID Stations Visualizations
Station 5 Handover Terminal: Digital As-Builts / Records
Station 6 Innovation Lab: AI Pilot Program / Innovation
video
Results!
• Efficient, repeatable 300% – 1300%
output
• Higher confidence 5% - >90%
review coverage
• Reporting, Reverse indexingNew capabilities
• Delivery, Resiliency, Maintenance Expanded future
use cases
• Standards, Design, Query, Prompts Changing the way we work
41
Eye-tracking
Moment-by-moment
insights into unfolding
cognition, uncovering
pain points and optimal
design solutions
Eye-tracking +
Augmented
Reality Ability to manipulate and test objects
Insights into interactions with
environment
43
44
Station 7 Destination: Digital Twin
Digital Twin - Capabilities
Real World Virtual World
Digital Twin - Capabilities
Real World Virtual World
Integrated 3D model
Connected data
Monitoring capacity
Simulation
Maintenance
Digital Twin – Types and Progression
Descriptive • Identical to real
world
• Linked asset info
Informative • Sensor Data
• Performance
• Monitor
Predictive • IOT Sensors
• Warning thresholds
• Predictive maintenance
Comprehensive • Train AI Agents
• Automated work
orders
Digital Twin – Types, Examples, Pilots
Informative • Sensor Data
• Performance
• Monitor
Predictive • IOT Sensors • Warning thresholds • Predictive maintenance
Comprehensive • Train AI Agents
• Automated work
orders
Descriptive • Identical to real
world
• Linked asset info
© 2025 Autodesk. All rights reserved.
Thank you!
© 2025 Autodesk. All rights reserved.
Advancing Rail Through Digital Innovation in Seattle, Washington
Next Stop: Sound Transit
Default Section Slide 1 Slide 2: Speakers Slide 3: Agenda Slide 4 Slide 5 Slide 6 Slide 7 Slide 8 Slide 9 Slide 10 Slide 11: State of the Possible – Past and Future Slide 12 Slide 13 Slide 14 Slide 15: Sound Transit CDE (Autodesk Construction Cloud) Slide 16: Data analytics dashboards Slide 17 Slide 18 Slide 19 Slide 20 Slide 21 Slide 22 Slide 23 Slide 24: Building Information Modeling Slide 25 Slide 26 Slide 27 Slide 28 Slide 29 Slide 30 Slide 31 Slide 32 Slide 33 Slide 34 Slide 35: CID Stations Visualizations Slide 36 Slide 37 Slide 38 Slide 39 Slide 40 Slide 41: Eye-tracking Slide 42 Slide 43 Slide 44 Slide 45 Slide 46 Slide 47 Slide 48 Slide 49 Slide 50 Slide 51 Slide 52