How is the digital twin capable of creating a virtuous circle into a mega-project | Presentation

How is the digital twin capable of creating a virtuous circle into a mega-project | Presentation

Download the full presentation now.

How is the digital twin capable of creating a virtuous circle into a mega-project | Presentation

© 2024 Autodesk. All rights reserved.

Rail Summit 2024 How is the digital twin capable of creating a virtuous circle into a mega-project

Speaker

Currently I’m on construction site 6&7 TELT

BIM Manager

Michele Positano

Experiences

 Experiences

o Maldives Airport

o Bangkok Airport

o Dubai Entisar Tower

o Paris Foundation Cartier

o Montpellier Hospital

Experience Tramway Liege

Metro 15 Paris

Speaker

I am an Italian Transport Engineer and a Senior Project

Manager with over 40 years of experience in Italy and abroad.

BIM Manager TELT

Salvatore D’Alfonso

Speaker

I am an Italian Transport Engineer and a Senior Project

Manager with over 40 years of experience in Italy and abroad.

BIM Manager TELT

Salvatore D’Alfonso

Agenda

1 Abstract

2 Context

3 Objectives

4 Solutions

5 Benefit fact

6 Next steps

Abstract

Abstract

 Maturity of BIM

infrastructure (TUNNEL)

 Digital Twin

 Healthy and safety

Abstract

 Change Paradigm

o Combined

o Integrated

o User

o Linked

Abstract

 Maturity of BIM

infrastructure

(TUNNEL)

o Resilience

o Transparency

o Democratic

 Digital Twin

 Healthy and safety

Context

RA IL SU MM IT 20 2 4

TELT In a nutshell

About the Project

The cross-border section of the new Lyon‐Turin line is a new railway line of approximately 67 km linking

Saint‐Jean‐de‐Maurienne to Susa in Italy and Bussoleno, where it connects to the historic

Turin‐Modane line.

The line required the digging of a 57.5 km two-tube

tunnel, with one lane per direction, of which about 45

km was in French territory and about 12.5 km in Italian

territory.

About TELT

TELT is the public binational promoter, founded on

23 February 2015, and responsible for the realisation

and operation of the line. It is a French company

owned 50% by the French State (via the Ministry for

the Ecological Transition) and 50% by the Italian State

(via the Ferrovie dello Stato Italiane group).

RA IL SU MM IT 20 2 4

General view of the Project A Project “unique” in its kind

RA IL SU MM IT 20 2 4

General view of the Project The figures and the topics of the complexity

• 12 construction sites between France and Italy: 9 are civil engineering worksites, 2 for the treatment of excavation materials and a unique worksite that will provide the installation of the technological equipment at the end of the construction of the civil works.

• A total volume of materials to be excavated of about 37 million tons, of which 30 million tons on the French side and about 7 million tons on the Italian side. • Lyon-Turin is a bi-national Project: BIM on infrastructures has not the same level of implementation and maturity in France and in Italy. • The Project crosses the Alpine sites, with very high environmental sensitivity • Studies and preliminary works carried out from October 2001 to February 2015 by LTF (Lyon Turin Ferroviaire), owned by the operators of the RFF and RFI

railway networks, with traditional methods. • TELT decided to introduce in the uses of BIM, beyond the 3D three-dimensional modelling, the temporal sequencing of the execution of works (4D) and the

control of project costs (5D), also the operation of the built structure and its maintenance over time (6D), the energy and environmental control (7D) and to add to the 3D model the security information (8D) to predict risks in the construction process and identify activities that need to be implemented to improve occupational safety and prevent accidents.

RA IL SU MM IT 20 2 4

Operational Sites 6&7

RA IL SU MM IT 20 2 4

 Ligne 15

 Toronto

RA IL SU MM IT 20 2 4

RA IL SU MM IT 20 2 4

RA IL SU MM IT 20 2 4

Project CO6-7 Major sector

RA IL SU MM IT 20 2 4

Operational sites 6 & 7 Major sector

• 45 km of galleries constructed with 3 segment TBMs (11717 rings) • 1 segment prefabrication plant • 21 km of galleries carried out in conventional method • 55 km of conveyor belts to evacuate excavated materials

RA IL SU MM IT 20 2 4

Operational sites 6

RA IL SU MM IT 20 2 4

Operational sites 7

Objectives

Objectives TELT

Management

Safety

Quality

Soustenaibility

RA IL SU MM IT 20 2 4

Objectives

How TELT manages

the complexity

of a mega-project

RA IL SU MM IT 20 2 4

Objectives TELT

 Management

 CDE

 X Dimension

 Training

3D

4D

5D

6D

7D

8D

9D

10D

Objectives SO 6&7

Management

Safety

Quality

Sustenaibility

Objectives CO 6 & 7 3D

4D

5D

6D

7D

8D

9D

10D

Solutions

Solutions

 Digital Twin

 CDE

 X Dimension

 Training

Digital Twin

 Phases

o Information update

o Information exchange

CDE

 LOD

 Deliverables

4D

 Easy to

5D

 Easy to

 Easy to

o Information update

o Information exchange

Training & Works

Training & Works

Training & Works

Training & WorksTraining & Works

Benefit fact

RA IL SU MM IT 20 2 4

Benefits

 Avoid demolition

 Respect milestones

 Minimize risks

How BIM maximizes the

added value

TELT

RA IL SU MM IT 20 2 4

Benefits

 Avoid demolition

 Respect milestones

 Minimize risks

How BIM maximizes the

added value

SO 6&7

Next steps

Next steps

 IoT

 Machine learning

 Data Analysis

“Il n’y a peut-être rien de si fou que de croire avoir

toujours raison.”

“There is perhaps nothing so crazy as believing

that you are always right.”

Voltaire

Thank you!

Title

www.company.de

Michele and Salvatore

john@company.de

Rail Summit 2024 Presentation Folie 1: Rail Summit 2024 Folie 2: Speaker Folie 3: Experiences Folie 4: Experience Folie 5: Speaker Folie 6: Speaker Folie 7: Agenda Folie 8: Abstract Folie 9: Abstract Folie 10: Abstract Folie 11: Abstract Folie 12: Context Folie 13: TELT Folie 14: General view of the Project Folie 15: General view of the Project Folie 16: Operational Sites 6&7 Folie 17 Folie 18 Folie 19 Folie 20: Project CO6-7 Folie 21: Operational sites 6 & 7 Folie 22: Operational sites 6 Folie 23: Operational sites 7 Folie 24: Objectives Folie 25: Objectives TELT Folie 26: Objectives Folie 27: Objectives TELT Folie 28: Objectives SO 6&7 Folie 29: Objectives CO 6 & 7 Folie 30: Solutions Folie 31: Solutions Folie 32: Digital Twin Folie 33: CDE Folie 34: 4D Folie 35: 5D Folie 36 Folie 37: Training & Works Folie 38: Training & Works Folie 39: Benefit fact Folie 40: Benefits Folie 41: Benefits Folie 42: Next steps Folie 43: Next steps Folie 44 Folie 45: Thank you!


Item Type: pdf