Future CDE Strategy in Railway Projects: BIM Use from Design to Maintenance | Presentation

© 2025 Autodesk. All rights reserved.
Design & Make the Future of Rail
Rail Summit 2025
Future CDE Strategy in Railway Projects BIM Use from Design to Maintenance
Image courtesy of [Name]
Mr. Kosuke YAMAMOTO, Assistant Manager
Ms. Mutsumi YONEYAMA, Chief Staff
Mr. Tamaki NAKAGAWA, Deputy Manager
TO REPLACE IMAGE:
1. Right-click image
2. Select Change Picture
Agenda
Image courtesy of [Name]
TO REPLACE IMAGE:
1. Right-click image
2. Select Change Picture
3. Select From a File
to choose an image
4. Credit image (if necessary)
01
02
03
04
Introduction JRE-BIM Cycle
Cases of using JRE-BIM
Next CDE for JRE-BIM
Summary of this presentation
Sharing JR EAST’s challenge toward data-driven railway construction
projects:
● Overview of CDE at JR EAST and future development plans:
-50% Unnecessary Work Time
-80% Consistency Check Time
● Pilot projects using BIM and point clouds + current CDE issues
Speakers
5
Ms. Mutsumi,
YONEYAMA
Chief Staff
Tokyo Construction Project
Management Office
Business Transformation and
New Business
“BIM/CDE Implementation Lead.”
Mr. Kosuke,
YAMAMOTO
Assistant Manager
Construction Dept. HQ
Technology Strategy and DX
“System coordinator”
Mr. Tamaki,
NAKAGAWA
Deputy Manager
Tokyo Construction Project
Management Office
Stationfront Town Development
Division
“BIM/CDE Implementation Lead.”
@Tokyo Sta. (Marunouchi Station Building)
6
JAPAN & JR East (East Japan Railway Company)
45,000 1,600 7,300km
Employees Stations Railway lines
China
N.Korea
S.Korea
Russian
JAPAN
. TOKYO
1,300 600
Onsen(Hot Springs) Sake brewery
Population Trends in Japan
7
0
20
40
60
80
100
120
140
2020 2030 2040 2050 2060
P o p
u la
ti o n
(m ill
io n )
Year
Age 0–14 Age 15–64 Age 65+
126
97
Population Decline
70
50
37
37
(56%)
(51%)
(38%)
(29%)
Estimated by World Population Prospects 2022
8
Boundary between Civil Engineering and Architecture
Boundary between Civil Engineering and Architecture
Architecture
Civil Engineering Platform
Station building Station mall
Elevated artificial groundRail track
Electronic
Architecture
Civil Engineering
Canopy
9
Civil Engineering
Elevated railway Rail track Railway bridge
Railway tunnel Platform
Title only
10
・駅舎・駅ビル・自由通路などの設計・改良・新設 ・都市開発・まちづくりプロジェクト ・商業施設・ホテル・オフィスなどの建築設計 ・グラフィック・プロダクトデザイン、BIM・3D設計
・線路・橋りょう・トンネルなどの鉄道インフラの維持管理・改良 ・自然災害対策工事や設備更新 ・高架橋・地下構造・ホーム・バリアフリー設備などの設計 ・連続立体交差事業(高架化)
Architecture
Station
Hotel,Office
ShopUrban development
Waiting room
Another building
Bench
Two Section of Facility Management of JR-EAST
11
Planning Design Construction Maintenance
Construction Department
Facilities Department
Contract Delivery Methods in Japan
12
コンサルゼネコン
General
contractor
Sub
contractor
Sub
contractor
Architecture Civil Engineering
Electrical Systems
General
contractor
Sub
contractor
Sub
contractor Sub
contractor
Sub
contractor
Problems with data sharing!!
General
contractor
Agenda
TO REPLACE IMAGE:
1. Right-click image
2. Select Change Picture
3. Select From a File
to choose an image
4. Credit image (if necessary)
01
02
03
04
Introduction
JRE-BIM Cycle
Cases of using JRE-BIM
Next CDE for JRE-BIM
Over 10 Years ago – before JRE-BIM
14
Review of Design Inspection of Construction Completion
10 years-ago, we launched “JRE-BIM” to implement DATA-DRIVEN
railway construction projects
【Goals】
Build a CDE platform
Utilize BIM and Point Cloud data
Use Common Data from Construction through
Maintenance
JRE-BIM - Policy -
15
What is JRE-BIM / JRE-BIM cycle
16
Point cloud
data
JRE
Cloud
Risk resolution of
inconsistencies
between drawings
and design
calculations
Desig
n
Reduction of forms and
Automation of Determination Work
Planning
Design
OrderingConstruction
Maintenance Consultants
BIM Model PointCloud
⇒ Easier & Faster Planning
JRE-BIM cycle
17
Risk resolution of
inconsistencies
between drawings
and design
calculations
Desig
n
Semi-automated
calculation of quantities and construction costs
Reduction of forms and
Automation of Determination Work
Centralized
data from construction to maintenance
phase.
Plan
OrderingConstruction
Maintenance Design
Consultants
BIM Model PointCloud
⇒ Reduce mismatches
Between drawings & calculations
⇒ Speed up
JRE-BIM cycle
18
Facilities
Point cloud
data
JRE
Cloud
Risk resolution of
inconsistencies
between drawings
and design
calculations
Desig
n
Semi-automated
calculation of quantities and construction costs
Reduction of forms and
Automation of Determination Work
Centralized
data from construction to maintenance
phase.
Plan
OrderingConstruction
Maintenance Design
Contractors
BIM Model PointCloud
⇒ Faster and Easier
Calculation of costs
JRE-BIM cycle
19
JRE
Cloud
Risk resolution of
inconsistencies
between drawings
and design
calculations
Desig
n
Semi-automated
calculation of quantities and construction costs
Reduction of forms and
Automation of Determination Work
Centralized
data from construction to maintenance
phase.
Plan
Ordering
Maintenance Design
Construction
BIM Model PointCloud
⇒ Reduce paperwork &
Automate Quality Checks
Contractors
JRE-BIM cycle
20
Risk resolution of
inconsistencies
between drawings
and design
calculations
Desig
n
Semi-automated
calculation of quantities and construction costs
Reduction of forms and
Automation of Determination Work
Centralized
data from construction to maintenance
phase.
Plan
Ordering
Design
Construction
Maintenance
BIM Model PointCloud
⇒ Maintenance & Disaster
Recovery by same BIM data
Contractors
BIM Cloud to JRE Cloud (STEP 1)
CDE for JRE-BIM (2016-2024)
21
Cloud & Workflow system based on in-house
◼Share the Final Data
Private Cloud + Workflow
◼No hardware maintenance.
◼Flexible Hardware
Configuration
◼Data transfer to Asset Management System
2024.8 -
JRE CloudBIM Cloud
2016 - 2024.8
“Cloud for Paperless Work ” “Stable Operation and Scalability”
→Using on ALL our Projects
Consultants
Contractors
◼ Requires In-house Server Maintenance
◼Collaborative Workflow System
Consultants
Contractors
JRE Cloud Asset Management S.
Next
・How the CDE is used in pilot projects
・Efforts and issues with JRE-BIM
by Ms. YONEYAMA
Mr. NAKAGAWA
22
Agenda
Image courtesy of [Name]
TO REPLACE IMAGE:
1. Right-click image
2. Select Change Picture
3. Select From a File
to choose an image
4. Credit image (if necessary)
01
02
03
04
Introduction
JRE-BIM Cycle
Cases of using JRE-BIM
Next CDE for JRE-BIM
JRE Cloud Use Cases
24
2D図面
ConsultantsContractors
Workflow
Would like to…
Cases of using JRE-BIM
for Civil engineering
25
Construction planning
Point Cloud
Case 1 【Design】 Track planning with BIM design (point cloud + BIM)
BIM
Construction planning
Point Cloud
Case 1 【Design】
New line
Linear planning with BIM design (point cloud + BIM)
Design Ordering
Details of the bridge pier bearing inspection equipment
Boundary details between truss bridges
How to inspect in Bridge
Case 2 【Design】 Checking maintainability during BIM design
Design Maintenance
Overview of the Track Construction Planning Case 3 【construction】
営業線との離隔も正確に把握可能
Design Construction
Cases of using JRE-BIM
for Architecture
30
Examination of details for the exterior design
Cases of BIM Use in the Detailed design phase
before after
Cases of BIM Use in the Detailed design phase
Opening ratio 39%
Opening ratio 22%
Opening ratio 14%
Which design do you prefer?
Cases of BIM Use in the Detailed design phase
Check visibility
Design consideration
Basic and detailed using BIM
Cases of BIM Use in the Construction Phase before
Driver’s View Signal light
Utilizing BIM to verify signal visibility
New Canopy
Cases of BIM Use in the Construction Phase
before
14 pax × 1 day 4 pax × 2 hours
after
Cases of BIM Use in the Construction Phase
Driver’s View
XLSX
DOCX
BIM model
Equipment
Ledger etc
Specification
Product date
etc
Report
Contract etc
Situation photo Utilized by staff on-site
Cases of BIM Use in the Facility management
Equipment
Information
Incident
Information
Development of a BIM Viewer for Facility management
BIM model 2D drawing Properties
Intuitive UI
Model information viewing display
Cases of BIM Use in the Facility management
Non-exposed equipment
Route visualization
Color-coded asset classification
Ex. Water pipe(light blue) drain pipe(brown) fire pipe(red) ventilation pipe(black)
Ex. Architecture(red) Machine(yellow) Electricity(pink) Telecommunication(orange)
Data link Conditional search
Ex. Model number search
Ex. specification
Model information viewing display
Cases of BIM Use in the Facility management
Cases of BIM Use in the Facility management
3階
I’d like to know
the cause and how
to repair it.
Water leakage occurred from the ceiling in the third-floor corridor.
Cases of BIM Use in the Facility management
BIM modeling of existing buildings
We started BIM Viewer with hospitals as pilot models.
Also considering methods for creating BIM models of a large number of existing buildings
BIM modeling of existing buildings
Create BIM models BIM Model1,600 Stations
and lots of buildings
Issues in the Current Workflow with CDE
45
現行の課題:毎回ダウンロード・再アップロードを示す
JRE Cloud
PCs
Issues in the Current Workflow with CDE
46
コンサルゼネコン
General
contractor
Sub
contractor
Sub
contractor
Architecture Civil Engineering
Electrical Systems
General
contractor
Sub
contractor
Sub
contractor Sub
contractor
Sub
contractor
General
contractor
Issue = Data Sharing
Next
・Next CDE for JRE-BIM
by Mr. YAMAMOTO
47
Agenda
01
02
03
04
Introduction
JRE-BIM Cycle
Cases of using JRE-BIM
Next CDE for JRE-BIM
⚫ Reduction in Download / Upload loss-time
⚫ More Efficient DATA collaboration in CAD/BIM
⚫ Reduction in Search Time with RAG
Next CDE for JRE-BIM
JRE Cloud STEP2 Development (-2027)
Next CDE for JRE-BIM
50
Dual CDE Architecture with Role Segmentation
Copy Function
Dual CDE for Better Cloud Data Management
JRE Cloud Contract
Final Deliverables
Approval Documents and Workflow In-progress BIM and CAD
Cost down & Separate Risks
Workflow-related files
JRE Cloud & ACC: When to Use Each
Using the New CDE – Project Start (1/5)
51
Project : A Station Design (Civil)
JRE Cloud
Project : A Station Design (Civil)
Contract
One-to-One Linked (Automatic)
A B C A B C
JRE Cloud & ACC: When to Use Each
Using the New CDE – Design & Revisions(2/5)
52
Project : A Station Design (Civil)
JRE Cloud
Project : A Station Design (Civil)
Contract Approval
Form
JRE Cloud & ACC: When to Use Each
Using the New CDE – Consistency check (3/5)
53
Project : A Station Design (Architecture)
Project : A Station (ALL)
Project : A Station Design (Civil)
A B C D E F
A B C D E F
JRE Cloud & ACC: When to Use Each
Using the New CDE – Final Delivery (4/5)
54
Project : A Station Design (Civil)
JRE Cloud
Project : A Station Design (Civil)
Contract Approval
Form
Project : A Station (ALL)
JRE Cloud & ACC: When to Use Each
Using the New CDE – Next Step(Construction) (5/5)
55
Project : A Station Construction
(Civil)
JRE Cloud
Project : A Station Construction
(Civil)Contract
Project : A Station (ALL)
One-to-One Linked (Automatic)
Project : D Station Design (Civil)
JRE Cloud & ACC: When to Use Each
New CDE – RAG-based Search (Future Plan)
56
JRE Cloud
Project : A Station Design (Civil)
STEP2 Development (-2027)
2028-
Project : C Station Design (Civil)
Project : A Station Design (Civil)
Contract Approval
Form Other private strage
RAG Search
New CDE - Goal
57
JRE Cloud
Copy Function
-50% Unnecessary Work
-80% Consistency Check Time
Other private strage
RAG Search
1. JRE-BIM and Current CDE
- JR-EAST’s 10-year journey toward data-driven railway construction
2. Use Cases and Challenges of CDE
- Examples in the pilot projects
- JRE Cloud needs improvement
3. Future CDE under Development – JRE cloud STEP2
- New CDE with ACC to More efficient DATA collaboration in CAD/BIM
- Reduction in Search Time with RAG
Conclusion
58
We welcome open discussion for next journey !
© 2025 Autodesk. All rights reserved.
Add date
here
Mr. Kosuke Yamamoto Ms. Mutsumi Yoneyama Mr. Tamaki Nakagawa
Thank you! kousuke-yamamoto@jreast.co.jp
yoneyama-m@jreast.co.jp
nakagawa-tamaki@jreast.co.jp
mailto:kousuke-yamamoto@jreast.co.jp mailto:kousuke-yamamoto@jreast.co.jp mailto:kousuke-yamamoto@jreast.co.jp mailto:yoneyama-m@jreast.co.jp mailto:yoneyama-m@jreast.co.jp mailto:yoneyama-m@jreast.co.jp mailto:nakagawa-tamaki@jreast.co.jp mailto:nakagawa-tamaki@jreast.co.jp mailto:nakagawa-tamaki@jreast.co.jp
Autodesk and the Autodesk logo are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affi liates in the USA and/or other countries. All other brand names, product names, or trademarks belong to their respective holders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors that may appear in this document. © 2025 Autodesk. All rights reserved.
60
既定のセクション Slide 1 Slide 2: Future CDE Strategy in Railway Projects
1_introduction Slide 3: Agenda Slide 4: Summary of this presentation Slide 5: Speakers Slide 6: JAPAN & JR East (East Japan Railway Company) Slide 7: Population Trends in Japan Slide 8: Boundary between Civil Engineering and Architecture Slide 9 Slide 10: Title only Slide 11: Two Section of Facility Management of JR-EAST Slide 12: Contract Delivery Methods in Japan
2_JRE-BIM cycle Slide 13: Agenda Slide 14: Over 10 Years ago – before JRE-BIM Slide 15: JRE-BIM - Policy - Slide 16: What is JRE-BIM / JRE-BIM cycle Slide 17: JRE-BIM cycle Slide 18: JRE-BIM cycle Slide 19: JRE-BIM cycle Slide 20: JRE-BIM cycle Slide 21: CDE for JRE-BIM (2016-2024) Slide 22: ・How the CDE is used in pilot projects ・Efforts and issues with JRE-BIM by Ms. YONEYAMA Mr. NAKAGAWA
3_Cases Slide 23: Agenda Slide 24: JRE Cloud Use Cases Slide 25 Slide 26 Slide 27 Slide 28 Slide 29: Overview of the Track Construction Planning Slide 30 Slide 31 Slide 32 Slide 33 Slide 34 Slide 35 Slide 36 Slide 37 Slide 38 Slide 39 Slide 40 Slide 41 Slide 42 Slide 43 Slide 44 Slide 45: Issues in the Current Workflow with CDE Slide 46: Issues in the Current Workflow with CDE Slide 47: ・Next CDE for JRE-BIM by Mr. YAMAMOTO
4_Next CDE Slide 48: Agenda Slide 49: Next CDE for JRE-BIM Slide 50: Next CDE for JRE-BIM Slide 51: Using the New CDE – Project Start (1/5) Slide 52: Using the New CDE – Design & Revisions(2/5) Slide 53: Using the New CDE – Consistency check (3/5) Slide 54: Using the New CDE – Final Delivery (4/5) Slide 55: Using the New CDE – Next Step(Construction) (5/5) Slide 56: New CDE – RAG-based Search (Future Plan) Slide 57: New CDE - Goal
5_Conclusion Slide 58: Conclusion Slide 59 Slide 60