Forms, location and assets for Quality management in Autodesk Construction Cloud from engineering to construction phase | Presentation
Download the full presentation now.

© 2024 Autodesk. All rights reserved.
Rail Summit 2024 Make the Future of Rail
MAKE THE FUTURE OF RAIL
© 2024 Autodesk. All rights reserved.
From engineering to construction phase
Forms, location and assets for Quality management in ACC Build.
Agenda
1 SAIPEM needs
2 Solution overview
3 How digitalize and define Project Granularity
4 How digitalize on-site Quality Controls
5 Create Reports / Dashboards
6 Conclusion / Next Steps
RA IL SUMMI T 20 24
Speakers
Civil engineer with over 30 years of experience in the field of sustainable
infrastructures.
He has worked on several projects of great relevance in Italy and abroad,
dealing with planning, design, construction and management of hydraulic,
energy, and transport infrastructures works.
Quality manager of Sustainable Infrastructure division / Saipem Attilio Barberi
Senior Implementation Consultant / Autodesk Mattia Firinu
Architect specializing in BIM methodology with a focus on the AEC
industry.
He supports customers in enhancing processes and workflows by
adopting Autodesk tools as ACC, Revit, Navisworks, Dynamo etc.
Particular emphasis on data management to drive innovation and deliver
significant value.
spe ak
e r
co- sp
ea ke
r
RA IL SUMMI T 20 24
Saipem in the Word
RA IL SUMMI T 20 24
One Saipem, organized into business lines
Saipem needs
To develop a fully digital, paperless QC process
Managing Asset status
starting from Quality Control inputs
leveraging the Forms
potentiality in ACC Build
during the Construction Phase
RA IL SUMMI T 20 24
AS-IS situation Current scenario during Quality Controls during Construction phase
*Image generated trough AI
RA IL SUMMI T 20 24
Pain Points Solutions
Difficult to manage big amount of
data during Quality Control
Digitalize Process and data
management
Stakeholders with different level of
“Digital Maturity”
Find Solutions for
Mixed and Fully Digital Approach
Difficult to monitor
Quality Controls progress during the
Construction phase
Use data to create dashboard and
graphs to keep under control
Quality Control activities
Consolidated use of paper-based
documents to demonstrate
compliance to requirements
Manage contractual interfaces with
Client to get formal acceptance of
digital evidence
Waste of time in producing the final
dossier
Leveraging all ACC potentialities
using Forms, Reports & exports
...last, but not least...
RA IL SUMMI T 20 24
Scenario 1 Scenario 2
Client
DIGITALIZATIO
N
Client
DIGITALIZATIO N
For different digital maturity
Useful approach in a transition phase, but
requires specific approval workflows and set-up
Construction Contractor
Construction Contractor
Solution overview
Build
Insight
Docs
RA IL SUMMI T 20 24
Autodesk Construction Cloud Manage Quality Checks during Construction Phase
Empower builders with a field execution and project management solution to seamlessly collaborate and deliver construction projects on time, on budget
Enable estimators to perform more accurate 2D takeoffs and generate automated quantities from 3D models
Empower BIM experts to improve constructability of models, increase transparency in managing risk, and facilitate more efficient design collaboration
Organize, distribute, and share files on a single, connected document management platform, ensuring all team members have access to the information they need
Project Management
Quality Management
Safety Management
Project Closeout
Cost Management Design Collaboration
Aggregated Model Coordination
Issues Management
Automated Clash Detection
2D Takeoff
3D Takeoff
Scope Analys is
Document Control Document Versioning Document Approvals
ACC Mobile App
INSIGHT
Dashboards Reporting Construction IQ Data ConnectorGet up to speed with what's going on in a project, assess trends and patterns in project data, identify any gaps and problems, and use predictive risk data
to improve project efficiency
RA IL SUMMI T 20 24
Scenario 1 – Mixed Approach High Level Workflow - From paper to Digital
Assets
SAM SAM
VIR
PCQ
Supplier SAIPEM Customer
WIP SHARED
SAM
reports
ACC Report
DOSSIER
Collect reports
Locations SAM
VIR VIR
PCQ PCQ
VIR
reports
Certificate Certificate Certificate
PCQ
reports
DDT DDT DDT
OdS
visualize asset Status
Data
Connector
data
Dashboards
Model
Color Coding
OdS
SAM PUBBLISHED
VIR
ACC Form
SAM
ACC Form
INSIGHT
DOSSIER
insight
ACC Forms
controlli (PCQ)
ACC Form
DOCUMENT
DIGITALIZED AND
RELATIONSHIPS
Export repor ts
RA IL SUMMI T 20 24
Scenario 2 – Fully Digital High Level Workflow - Fully Digital
ACC Forms
Assets
Supplier SAIPEM Customer
SAM
reports
ACC Report DOSSIER Collect reports
Locations
VIR
reports
Certificate
PCQ
reports
DDT
OdS visualize asset Status
Data
Connector
data
Dashboards
Model
Color Coding
OdS
VIR
ACC Form
SAM
ACC Form
insight
control (Sheet)
ACC Form
(Child)
DOCUMENT DIGITALIZED AND RELATIONSHIPS
Export repor ts
SHARED PUBBLISHEDINSIGHT
In progress
In progress
In progress
control (PCQ)
ACC Form
(Parent)
In progress
control (PCQ)
ACC Form
(Parent)
In review
Closed
SAM
ACC Form
SAM
Export PDF
VIR
ACC Form
In review
Closed
In review
Closed
Check
RA IL SUMMI T 20 24
Asset and Forms interaction Schema Connecting the assets to the appropriate Quality Control (QC) forms
NWC
Setup
Asset
Mapping
Add Reference
[Form to Asset]
or
[Asset to Form]
Create
Form by
Template
Create data to monitoring Change Asset Status
Asset 1 Asset 2 Asset 1 Asset 2
• Asset
• Forms
• Relationships
IFC
oropen
close
Power BI Dashboard
close
close
open open
open open
RA IL SUMMI T 20 24
Detailed Workflows
How Digitalize and define Project Granularity? Define hierarchy and granularity
Managing ACC Locations
Managing ACC Assets
RA IL SUMMI T 20 24
ACC Location
WBS 7 - Primary Work
“Opera principale”
WBS 8 – Work Segment
“Tratto d’opera”
WBS 9 - Part of work
“parte d’opera”
Location set-up is at administrator level and
shall be prepared in advance
RA IL SUMMI T 20 24
ACC Assets
Asset:
Everything that has to be traced & monitored could be
managed as an Asset
Asset imported and mapped from Model (IFC or NWC)
RA IL SUMMI T 20 24
Topological’ set-up is ready
ACC Assets
1
1 2 3 4 4
1 Category
2 Status
3 Location
4 Custom Attributes
5 Asset Data
5
RA IL SUMMI T 20 24
Asset visual monitoring
ACC Assets
Assets can bring to life many
different information
Forms as
reference for
each asset
Color coding
aligned to
Asset Status
on the viewer
RA IL SUMMI T 20 24
Locations and Assets can live
also without the model, but
their coherent set-up is the
mandatory hinge with models
How Digitalize on-site Quality Controls? Define hierarchy and granularity
Managing ACC Forms:
o PCQ (Quality Control Plans)
o SAM (Material Approval Sheets)
o VIR (Receiving Inspections)
o NC (Non-Conformity)
RA IL SUMMI T 20 24
PCQ - SAM - VIR with Native ACC Forms
ACC Forms – Native Forms
The use of ACC-Build editor to create
forms, sometimes requires a
re-engineering process to fit different
features of existing forms in the
shape of sections & checklists
RA IL SUMMI T 20 24
PCQ - SAM - VIR with Native ACC Forms
ACC Forms – Native Forms
RA IL SUMMI T 20 24
Work is smooth on mobile with native forms
ACC Forms – Mobile App
RA IL SUMMI T 20 24
Non-Conformity with Smart PDF Approach
ACC Forms – Smart PDF
Some current forms
are very complex (for contents and workflows).
Additionally, they are already agreed in the
Contracts. In such cases we decided to import the
forms as "smart PDF"
Create Reports / Dashboards Final documentation and monitoring
Reports:
o PDF
o Excel
Dashboard
o Data Connector
o Power BI
RA IL SUMMI T 20 24
PDF format
Reports A good quality of PDF printouts can be easily obtained
...even if this make the process less digital
RA IL SUMMI T 20 24
Excel Report
Reports
Full set of data are always available via Excel export
RA IL SUMMI T 20 24
‘Native forms’ vs smart PDF forms
If ‘native forms’ (i.e. using template fully generated with ACC editor) are used:
o a full digital process is allowed
o Integrated Power BI dashboarding works very well.
o dashboards can be fed by scheduled reports (section Reports of Build).
o dashboards can be configured starting from the available templates.
If ‘smart PDF’ are used:
o in ACC integrated reports will appear only the data relevant to the status of the form and to the ‘form details’ (form name, location, references etc.)
o the data of the PDF can be exported in Excel only with a dedicated export
o dashboards can be in any case integrated into ‘Insight’ section of ACC Docs
Extraction of data from Forms
RA IL SUMMI T 20 24
Reports as PDF and Excel will
compose the Digital Dossier
that can be downloaded or
digitally shared to the Client.
RA IL SUMMI T 20 24
Power BI Dashboard
Reports
ACC Insight Dashboards
can be used to monitor Quality Checks during the Construction phase
progress.
Dashboards will be
helpful to manage Progress Status Report and manage/request
payments.
Conclusion Activity results and final considerations
ACC BUILD is a flexible set of tools to manage Checks during the construction phase
The use of internal editor to produce forms requires a certain re-engineering of complex
existing forms, but supports a full deployment of ACC BUILD potentialities
ACC assets and locations give the topological framework allowing to connect what you
do on site with powerful graphical representations (models & dashboards)
ACC Report Dashboards give powerful representations of
activities performed
A way to digital, paperless QC process has been identified
RA IL SUMMI T 20 24
Time savings estimation - QC days spent to control a single viaduct
Value measurement
Availability of digital data also brings improvements in the overall project management process
supporting progress measure and cost claiming
estimated saving of around 30%
Hypothesis:
Reducing time by 10% for each
control (compilation, correction,
etc.)
Final dossier ready at the end
of the construction works
end of
construction
dossier is ready
(manual approach)
dossier is ready
(digital approach)
manual approach
digital approach
Next Steps How proceed our journey?
Continue the step-by-step deployment of ACC Forms in current projects
Develop methods to automate change Asset Status starting from inspection
results as registered via Forms
Improve Form Templates in conjunction with Client to set-up a contractual
framework with a "positive attitude" towards digitalization
Improve Dashboards aligned to real project feedback
Investigate AI to create Final Dossier including all report in defined order
Q&A
Thank you!
Quality manager of Sustainable Infrastructure division / Saipem
attilio.barberi@saipem.com
www.saipem.com/it
Attilio Barbieri
Senior Implementation Consultant
Mattia Firinu
mattia.firinu@autodesk.com
https://www.saipem.com/it
Rail Summit 2024 Presentation Folie 1: Rail Summit 2024 Folie 2: Forms, location and assets for Quality management in ACC Build. Folie 3: Agenda Folie 4: Speakers Folie 5: Saipem in the Word Folie 6: One Saipem, organized into business lines Folie 7: Saipem needs Folie 8: AS-IS situation Folie 9: Pain Points Folie 10: Scenario 1 Folie 11 Folie 12: Autodesk Construction Cloud Folie 13: Scenario 1 – Mixed Approach Folie 14: Scenario 2 – Fully Digital Folie 15: Asset and Forms interaction Schema Folie 16: Detailed Workflows Folie 17: How Digitalize and define Project Granularity? Folie 18: ACC Location Folie 19: ACC Assets Folie 20: ACC Assets Folie 21: ACC Assets Folie 22 Folie 23: How Digitalize on-site Quality Controls? Folie 24: ACC Forms – Native Forms Folie 25: ACC Forms – Native Forms Folie 26: ACC Forms – Mobile App Folie 27: ACC Forms – Smart PDF Folie 28: Create Reports / Dashboards Folie 29: Reports Folie 30: Reports Folie 31: Extraction of data from Forms Folie 32 Folie 33: Reports Folie 34: Conclusion Folie 35: Value measurement Folie 36: Next Steps Folie 37: Q&A Folie 38: Thank you!