Data driven design collaboration for the Amsterdam Central Station capacity upgrade
In the Amsterdam Central Station project, a major upgrade includes the extension of the passenger tunnel and bicycle parking under the existing tracks. This presentation provides insights and best practices for working with the large Revit model created from drawings and point clouds. Key aspects include model management, scripting for flexibility, assessing track-platform relationships, using Enscape for design decisions, and integrating Cost-X for cost estimating.
