BIM Methodology: From Design to Construction. The Rome Termini Station Experience
Salcef Group presents the BIM-based renewal of Tracks I and II East at Rome Termini Station, replacing the traditional superstructure with Overail’s ballastless FAST SYSTEM. Autodesk tools supported coordination, clash detection, 4D planning and 5D cost control, demonstrating BIM as a strategic enabler for complex railway infrastructure delivery.
