Parramatta Light Rail Project (Australia)
Data from Digital Models to the Asset Management System
RA IL SUMMI T 20 24
Speakers
Architect from Madrid, ETSAM (UPM) University, with 15 years of experience in BIM
environments, being responsible for implementations in companies and BIM Manager Strategy in multidisciplinary large-scale projects. Member of the BIM User Group of Euskadi-Navarra, contributes to the standardization of this methodology in Spain.
Head of Digital BIM&CAD Area at CAF Turnkey & EngineeringEva Hernán
Architect from CEU San Pablo University with 10 years of experience in BIM environments,
being responsible for BIM coordination in different multidisciplinary projects. Currently working as BIM Engineer on coordination and management of several large-scale railway projects at CAF Turnkey & Engineering.
BIM Engineer at CAF Turnkey & EngineeringMarta Giménez
Asset & Digital Engineering Manager at CAFJulian O’Neill Digital Engineering Lead, seconded from BWB Consulting (a CAF Group Company).
11 years professional experience, in the UK and Australia in Flood Risk and Drainage Desing, with 6 years as Digital Engineering Lead on Parramatta Light Rail.
Agenda
1 Digital Engineering (DE) Strategy in Integrated Projects
2 Parramatta Light Rail (PLR) Project Overview
3 PLR DE/BIM Data Implementation Strategy
4 Modelling with Data: Overhead wiring
5 Data transition from Design&Construction to the MMIS
6 Q&A
RA IL SUMMI T 20 24
1 Digital Engineering (DE) Strategy in Integrated Projects
RA IL SUMMI T 20 24
1 Digital Engineering (DE) Strategy in Integrated Projects
CAFTE DE MMNT
PS
OCS
COMMS
CW
CDE
PCOTRA
INT
CAF GROUP
ROLLING
STOCK
DEPOT EQUIPMENT
SIG
PARTNER
RW
SUBSYSTEMS
CIVIL WORKS
CAF DE MANAGEMENT
CDE PCOINTEGRATION
INTEGRATED DE MANAGEMENT
CDE PCOINTEGRATION
Design Construction As Built O&Manteinance
Integrated
Project
CAF Project
Conventional
Project
RA IL SUMMI T 20 24
1 Digital Engineering (DE) Strategy in Integrated Projects
CLEAR OBJECTIVES
+
PROCESS SIMPLIFICATION
REDUCTION OF EFFORTS
+
INCREASE OF QUALITY
=
2 Parramatta Light Rail (PLR) Project Overview
12 km
16 Stops
2 Wire sections
13 CAF Urbos 100
RA IL SUMMI T 20 24
Federated Model
2 Parramatta Light Rail (PLR) Project Overview
RA IL SUMMI T 20 24
OIR + AIR + PIR + EIR = PDCS
PAS
1192-2
UCS
AIS
CDE PIM AIM GIS
BIM/CAD/GIS
2D 3D 4D
DEXP
MPDT
LOD
LOI770 Users
22 Companies
12 Disciplines
130 Subdisciplines
383 Models
30000 Assets
3 PLR DE/BIM Data Implementation Strategy
Autodesk SW
7000 Maintained Assets
RA IL SUMMI T 20 24
OIR + AIR + PIR + EIR = PDCS
PAS
1192-2
UCS
AIS
CDE PIM AIM GIS
BIM/CAD/GIS
2D 3D 4D
BEP
MPDT
LOD
LOI
Easy info
Essential Modelling +
Updated Teams
= PDCS
PAS
1192-2
UCS
AIS
CDE PIM AIM GIS
BIM/CAD/GIS
2D 3D 4D
DEXP
MPDT
LOD
LOI
Unique data base
Coordinated data
Updated Client
Unified Data
Simple Models +
Easy workflows
DEXP:
GIS Protocol
Asset Register
Information Protocol
770 Users
22 Companies
12 Disciplines
130 Subdisciplines
383 Models
30000 Assets
3 PLR DE/BIM Data Implementation Strategy
=
Autodesk SWAutodesk SW
7000 Maintained Assets
RA IL SUMMI T 20 24
DEXP:
Asset Register
Information Protocol
3 PLR DE/BIM Data Implementation Strategy
RA IL SUMMI T 20 24
TECHNICAL DESIGN Required
Technical DATA
3
SUBSYSTEMS Asset
Register WIP
Project Asset Register
Digital Engineering Deliverables
CDE
PLR DE/BIM Data Implementation Strategy
Asset Register
Information Protocol
PDCS (Client)
DEPX & Protocols
RA IL SUMMI T 20 24
SYSTEM
OS-ALL System – Overhead Structures – Project Wide
SYSTEM
OS-L10 System – Overhead Structures – L10 Corridor (WMD > PMS)
POSITION
OS-OHWS-CME-CP2+223 POSITION – Overhead Wiring Structure – CUMBERLAND HOSPITAL - CP2+223
Overhead Wiring Pole – Anchor Pole - SSA
SYSTEM
OS-OHWS-L10 System – Overhead Structures – Wiring – L10 Corridor (WMD > PMS)
ASSET
CP2+223-FT ASSET – Overhead Wiring Structure – CUMBERLAND HOSPITAL - CP2+223 - Footing
ASSET
CP2+223-PL ASSET – Overhead Wiring Structure – CUMBERLAND HOSPITAL - CP2+223 – Pole
CV06100100
ASSET
CP2+223-AN ASSET – Overhead Wiring Structure – CUMBERLAND HOSPITAL - CP2+223 - Anchor
ASSET
CP2+223-BC ASSET – Overhead Wiring Structure – CUMBERLAND HOSPITAL - CP2+223 – Bonding Connection
ASSET
CP2+223-BP ASSET – Overhead Wiring Structure – CUMBERLAND HOSPITAL - CP2+223 – Bonding Pit
3 PLR DE/BIM Data Implementation Strategy
Asset Register
Information Protocol STRUCTURE & CONTENT → MODELS & ASSETS
Supply Contractor (CAF) INFRA CONTRACTOR
C O
M P
A N
Y A
C O
M P
A N
Y B
FEDERATED MODEL
C O
M P
A N
Y A
C O
M P
A N
Y A
C O
M P
A N
Y A
RA IL SUMMI T 20 24
TECHNICAL DESIGN
Overhead Design Software DATA
Other Technical DATA
+
4 Modelling with Data: Overhead wiring
Overhead Asset
Register WIP
Project Asset Register
DATA IMPLEMENTATION
DYNAMO SCRIPTS FOR DATA TRANSFER
MODELS FOR COORDINATION & DELIVERY2D DRAWINGS
RA IL SUMMI T 20 24
4 Modelling with Data: Overhead wiring
PROJECT CREATIONSIMULATION DATARESULTSDATA CHECKDATA EXTRACTION
RA IL SUMMI T 20 24
4 Modelling with Data: Overhead wiring
RA IL SUMMI T 20 24
4 Modelling with Data: Overhead wiring
RA IL SUMMI T 20 24
SUBSYSTEMS Asset
Register WIP
Project Asset Register
IFC Model
CDE
Asset Register
Information Protocol
MMIS Asset
Information System – Hexagon
EAM
5 Data transition from Design&Construction to AIS
Project Asset Register
RA IL SUMMI T 20 24
5 Data transition from Design&Construction to MMIS
Using BIM in HxGN EAM
RA IL SUMMI T 20 24
Using BIM in HxGN
5 Data transition from Design&Construction to MMIS
Project Asset Register
RA IL SUMMI T 20 24Model view Real view
RA IL SUMMI T 20 24Model view Real view
¿Q&A?
Thank you!
Data from Digital Models to the Asset Management System
www.cafte.com
Eva Hernán eva.hernan@cafte.com
Julian O‘Neill julian.oneill@caf.net
Marta Giménez marta.gimenez@cafte.com
mailto:eva.hernan@cafte.com mailto:eva.hernan@cafte.com
Rail Summit 2024 Presentation Folie 1: Rail Summit 2024 Folie 2: Data from Digital Models to the Asset Management System Folie 3: Speakers Folie 4: Agenda Folie 5 Folie 6 Folie 7 Folie 8 Folie 9 Folie 10 Folie 11 Folie 12 Folie 13 Folie 14 Folie 15 Folie 16 Folie 17 Folie 18 Folie 19 Folie 20 Folie 21 Folie 22 Folie 23 Folie 24: ¿Q&A? Folie 25: Thank you!