Advancing Digital Transformation to Drive Results for Massachusetts Bay Transportation Authority (MBTA) | Presentation
Download the full presentation now.

© 2024 Autodesk. All rights reserved.
Rail Summit 2024 Make the Future of Rail
MAKE THE FUTURE OF RAIL
© 2024 Autodesk. All rights reserved.
Mattapan Modernization – Massachusetts Bay Transportation Authority
Advancing Digital Transformation to Drive Results
Agenda
1 HNTB’s Digital Infrastructure Focus
2 Project Overview
3 Setting the Scene
4 Delivering Value
5 VDC Real Time
Speakers
As a growth leader of HNTB’s Digital Infrastructure Solutions, he is focused
on firmwide delivery and organization development. With more than 30 years of experience in helping transportation clients with ambitious digital transformation efforts, he is focused on supporting this rapidly growing
professional practice provide differentiating value to our clients.
Digital Infrastructure Solutions Officer, Senior Vice President
Jeff Siegel, GISP
Phil has more than 13 years of experience with a primary technical focus on
track design. During his time with HNTB, he has worked on several large and complex projects serving as track designer, track discipline lead, deputy project manager, and project manager for projects in design through the
construction stage.
Project Manager, Associate Vice President
Phil Santos, PE
Digital Infrastructure Focus
Empowering digital platforms and data-driven initiatives to build modern, resilient and sustainable infrastructure, enterprises and communities.
Major Programs,
Analytics and Enterprise
Geospatial Applications
& Infrastructure
Asset Management and
Resilient Infrastructure
Software and
Systems Engineering
Virtual Design
and Construction
Creative and Community
Engagement
Project Overview Mattapan Line Transformation - MBTA
History of Line
Line Details
Project Goal
Project Overview Mattapan Line Transformation - MBTA
History of Line
Line Details
Project Goal
Project Overview
Design Challenges
Limited ROW Space
Environmental Concerns
Construction Phasing
Accessibility
Art of the Possible Connected Rail Design Workflow
Enables Tailored Approach based on Stakeholder
Just in Time Decision Making / Tracking
Design management
Simulation
Constructability Review
Autodesk Technology Center Boston
RA IL SUMMI T 20 24
Solutions
Project Coordination Environment
Autodesk Training
Environment configuration
Challenge
File Sharing
Cross Discipline Design
Design Coordination
Workforce Development
Environment Planning
Setting the Stage
Connected Disciplines
Survey
Imagery
Utilities
Station Design
ROW
Federated Model
Pulling It All Together
Delivering Value
Immediate
Coordination Across Disciplines
Station Design Alternatives
Unexpected
Visualizations
Operations Ready Model
One Step Further: Real Time VDC
Spatial Data
Non-spatial Data
Geometry
Structured Data
Unstructured Data
Data Dependencies
Q&A
Rail Summit 2024 Presentation Folie 1: Rail Summit 2024 Folie 2: Advancing Digital Transformation to Drive Results Folie 3: Agenda Folie 4: Speakers Folie 5: Digital Infrastructure Focus Folie 6 Folie 7: Project Overview Folie 8: Project Overview Folie 9: Project Overview Folie 10: Art of the Possible Connected Rail Design Workflow Folie 11: Solutions Folie 12: Connected Disciplines Folie 13: Pulling It All Together Folie 14: Delivering Value Folie 15: One Step Further: Real Time VDC Folie 16 Folie 17: Q&A