Leveraging BIM for $3.0 billion Deep-Level Tunnel High-Speed Rail (GTX-B) Project | Presentation

Leveraging BIM for $3.0 billion Deep-Level Tunnel High-Speed Rail (GTX-B) Project | Presentation

Download the full presentation now.

Leveraging BIM for $3.0 billion Deep-Level Tunnel High-Speed Rail (GTX-B) Project | Presentation

© 2024 Autodesk. All rights reserved.

Rail Summit 2024 Make the Future of Rail

MAKE THE FUTURE OF RAIL

© 2024 Autodesk. All rights reserved.

Leveraging BIM for $3.0 Billion Deep-Level Tunnel High-Speed Rail (GTX-B) Project

Jiyoung Kim Director of BIM Technology Development, Hanul CNB

2024 Rail Summit, Copenhagen, Denmark

Table  BIM Strategy of Korea

o Mandatory application of BIM in the design and construction phases

o Examples of BIM applications at each stage of the construction lifecycle

 Introduction to the GTX-B Project

o Project Overview

o Full route overview

o BIM Execution Plan

o Phase-by-phase implementation of the BEP

 BIM Tools and Technologies

o BIM Model Libraries

o Modeling Automation

o Drawing Automation

 BIM Utilization in the GTX Project

o Shift from 2D to BIM

o BIM-based As-Built Model

o Review of Construction and As-Built Models

o Clash Detection and Equipment Optimization

o Software requirements for information exchange

o Project Management and information exchange

 Conclusion

o Benefits and Impact

Speaker

• 17 years of experience as a civil structural engineer

• 6-year experienced BIM Manager in the railway sector

• Active as an author in Autodesk BIM forums, including the Dynamo forum.

• Participation in government-led infrastructure technology research and development

• Some of the software included in today’s presentation is either developed or planned by me

Director of Hanul CNB , Leader of Research & Development DPT.

Jiyoung Kim

Smart

Construction Industries

 Phased mandatory application of BIM based on project scale

o 2023 : mandated for public projects valued at over 100 billion Korean Won (roughly 70 million USD).

o 2026 : Extend to 50 billion KRW (≈ 40 million USD)

o 2028 : Over 30 billion KRW (≈ 23 million USD)

BIM Strategy of Korea Mandatory application of BIM in the design and construction phases

BIM required for public projects over 30 billion KRW

BIM required for public projects over 100 billion KRW

BIM required for public projects over 50 billion KRW

From 2023

Construction of first-class facilities such as roads and railways

Construction of second-class facilities such as bridges and tunnels

Construction of third-class facilities such as buildings

From 2026 From 2028

Traditional

Construction Industries

This gradual approach helps manage the added costs of BIM by starting with large public projects.

Gradually

adopting and

mandating

BIM Strategy of Korea Examples of BIM applications at each stage of the construction lifecycle

Design Construction Maintenance

Paradigm Shift

Applied Tech- nologies

2D Design Fragmented Stage

• 4D/5D BIM Design

• Integrated Phases

• On-site Production Labor Dependency

• Modularization • Automation

& On-site Monitoring

Information Disconnection On-site Visits Subjective

• Information Feedback

• Remote Control • Scientific

Site Data Collection Using Drones

Facility Planning with Big Data

Alternative Review Using VR

Automated BIM-Based Design

Equipment Automation & Robotic Construction

Rapid Construction Using 3D Printing

On-site Monitoring Using Drones

IoT-based Site Safety Management

Preventive Maintenance with Sensors

AI-based Facility Operation

Facility Monitoring Using Drones

#supporting the development and

applications

#Implement IoT

#Safety Speed

#Significant improvements

#why they are investing in them

Introduction to GTX-B Project Overview

 Project Details

o Title Great Train Express Line B (GTX-B) Construction Project

(high-speed rail network)

o Implementing Entity MOLIT, Republic of Korea

o Route / Length Songdo to Maseok, Korea / 80.08 km

o Budget $3.0 billion (approximately 4.2 trillion KRW)

o Duration 2022 to 2030

Seoul Station

Songdo

Maseok

GTX-B

#the metropolitan area, #Inhabited 20 million #30million annually

#metropolitan rail network, #under construction

Introduction to GTX-B Full route overview

#12min, #ICN Songdo

#Icn-Metr0

#N-A Pacific Tower

#3Million

#NATM 40-80

#Commercial Dt

#UnderConstruction Prj

# C3D #LOD300

Introduction to GTX-B

BIM

Alignment & Topography

Cooperation

Structural Engineering

Tunnel

Earthworks

BIM Execution Plan

 Key points of the BEP

o Alignment and Topography Design Review

o Earthwork Design Review

o Structure Design Review, Drawing, Quantity Review, Clash Detection

o Tunnel Design Review, Drawing, Quantity Review

o Interdisciplinary Interface Coordination

#CDE

Introduction to GTX-B Phase-by-phase implementation of the BEP

3D Terrain/Geological Data

3D Terrain

3D Geological Layer

▶3D terrain data based on survey ▶3D geological data for Entire Route

BIM Model Automation

Parametic Modeling

Rebar Modeling (LOD350)

▶Automatic Update BIM Models When the design changes

Parameter Based on OBS

Parameter

▶Rapid modeling automation technology for accommodating design changes

OBS-based Parameters

3D Quantity / 2D Verification

BIM Model

▶3D Quantity for Structures ▶Ensuring Accuracy

Quantity

BIM Extraction / Drawing

General Drawing

▶Extraction from BIM Model for Drawings with Additional 3D Views

Structural Drawing

Cooperation

Sharing information

▶CDE Operation with Web-Based BIM for Cooperation

Construction Management

#classification

#payment milestones

#progress paid rate

BIM Tools and Technologies BIM Model Libraries

 BIM Model Libraries

o Parametric BIM Model

o Development of Technology for Improving Productivity and Quality Control od Railroad Infrastructures BIM Design (2020, KRRI)

#Design Phase

#quickly building

#Tunnel Pattern

#Rock Formation

#rapidly build

#Design status

#KoreaRailroadResearchInstitute

#Digital Libraries

#Revt #SAC

BIM Tools and Technologies BIM Model Libraries

#Parametric Model

#Time required

#Design Changes

#Same Quality

BIM Tools and Technologies Linear Structures

 Curved Linear Models

#3D Linear

#Curved Structures

BIM Tools and Technologies Modeling Automation

Automation of Linear Structure Modeling

#parametric tunnel

cross-section profiles

#Curve coordinates

#Civil3D

#Excel

#Parameter

# placed along the

tunnel alignment

#Sweep

BIM Tools and Technologies Modeling Automation

Automation of Linear Structure Modeling

#Cross Section

#Parametric Libraries

#Swep

#Linearity

#Revit Add-In

#Multiple

#Changes in Pattern

#A Single Engineer

#20%

#Quantities

#Parametric Information

BIM Tools and Technologies Modeling Automation Linear Repetitive Elements

#Parametric Libraries

#Sleepers

#Catenary Poles

#Along the alignment

BIM Tools and Technologies Modeling Automation

 Automated Modeling

#Deatiled Information

#Parameters

#Scheduling Data

BIM Tools and Technologies Drawing Automation

 Draft & Drawings

o Paperless

▶Dall E

#BIM fully implemented

#Tablet PCs

#Paper Drawings Disappear

▶Development of Technology for Improving Productivity and Quality Control of Railroad Infrastructures BIM Design (2020, KRRI)

Survey: Will the introduction of BIM eliminate the need for paper drawings at construction sites?

It won’t be necessary

It will be necessary for the time being

It will continue to be needed

#lightweight, without smart pen

#Different approach

#Quickly Create

BIM Tools and Technologies Drawing Automation

 Draft & Drawings

o Drawing Automation

#Tunnel Cross-Sections

#Essentially share

#Same Parameters

#Single parametric

tunnel cross section

#generate various

tunnel profiles

BIM Tools and Technologies Drawing Automation

 Draft & Drawings

o Drawing Automation

▶AutoCAD ▶Revit Cross - Section

 CAD to Revit

o Paperless

BIM Tools and Technologies Drawing Automation

 Draft & Drawings

o Drawing Automation

▶AutoCAD ▶Revit Cross - Section

 CAD Dimension to Revit Dimension

o Paperless

BIM Tools and Technologies Drawing Automation

 Draft & Drawings

o Drawing Automation

 Adjusting the dimension line

BIM Tools and Technologies Drawing Automation

 Draft & Drawings

o Drawing Automation

 Dimension line

BIM Tools and Technologies Drawing Automation

 Draft & Drawings

o Drawing Automation

#Dimension Lines

#Revit Sheet

#Adjust dimension lines

#Similar shape

#Twice

BIM Utilization in the GTX Project Shift from 2D to BIM

▶Structural drawings ▶Underground utility drawings▶Topographic map

#Design Document

#3 Billon Dollars Project

BIM Utilization in the GTX Project BIM-based As-Built Model

GTX-B Yongsan Station

GTX-B, KTX, Seoul Metro Line 1 and 4 is installed and operated. And Shinbundang DX Line is planned.

GTX-B Seoul Station

GTX-A, B, KTX, Seoul Metro Line 1, 4, Gyeongui Line and Airport Railroad EXpress(A'REX)

is installed and operated.

#Biggest Challenge

#120 years old

#Skyscrapers

#5 metro Lines Intersect

#Avoiding Interferences

#Excavating 80-40

#All facilities #Re-implemented #Station Plan Reorganized #Gathered Information #Underground Facilities #Interferences #Updated

BIM Utilization in the GTX Project Review of Construction and As-Built Models

Pedestrian Flow Verification

The pedestrian movement path was reviewed in 3D.

Equipment Operation Review

Selection of optimal operating positions and review of working radius for construction equipment.

GTX-B Yongsan Station

Operational review of backhoe (0.6㎥)

#Indoor space in detail

#Evacuation route

#Es plans Evacuation Spaces

#YS SL Complicated / Underway

#other sections

#same sized equipment /Fusion 360

BIM Utilization in the GTX Project Clash Detection and Equipment Optimization

Clash detection

Review of interference and relocation plan between temporary structures and existing underground

facilities

Equipment Operation Review

Selection of optimal operating positions and review of working radius for construction equipment.

#range of construction equipment

#identify and address potential accidents

and risks.

BIM Utilization in the GTX Project Software requirements for information exchange

 BEP

o Sharing of models and information among project participants

o Process management and input cost management based on daily reports

o BIM-based transparent cost management

o Paperless Construction Site Document Management

#CDE

#simultaneously perform 4D and 5D BIM

BIM Utilization in the GTX Project Project Management and information exchange

#All Information

#Skateholders, Clients, Contractors

#Visually represented

#multile project #Simultaneously

#work force, material

Equipment, cost

# Web-Based

#Dashboard

#monitoring construction

progress and schedules

#over 40GB to be opened

#Web Browsers

#ObjectBased Information

#Daily Construction report

Social Impact

Expansion of digitalization in the Construction industry and connectivity with Other industries

Enhanced expertise among BIM-related professionals

Employment Retention Impact

Increased job satisfaction through improved work efficiency

Development of a skilled workforce with diverse technical expertise and increased workforce demand

Technical Impact

Improved accuracy in management through continuous, universal utilization of BIM data

Digital Twin implementation

Economic Impact

Time and cost savings through automated design. Enhancing overall project speed

Reduced operational costs and material savings through high-accuracy BIM model management

Conclusion  Benefits and Impacts

Q&A

Thank you!

Director of BIM Technology Development, Hanul CNB

www.hanulcnb.com

Jiyoung Kim

jicaprio80@hanulcnb.com

Linked/in/jicaprio80

MAKE THE FUTURE OF RAIL

Jiyoung Kim Director of BIM Technology Development, Hanul CNB

jicaprio80@hanulcnb.com

Linked/in/jicaprio80

www.hanulcnb.com

Rail Summit 2024 Presentation Folie 1: Rail Summit 2024 Folie 2: Leveraging BIM for $3.0 Billion Deep-Level Tunnel High-Speed Rail (GTX-B) Project Folie 3: Table Folie 4: Speaker Folie 5: BIM Strategy of Korea Folie 6: BIM Strategy of Korea Folie 7: Introduction to GTX-B Folie 8: Introduction to GTX-B Folie 9 Folie 10: Introduction to GTX-B Folie 11: BIM Tools and Technologies Folie 12: BIM Tools and Technologies Folie 13: BIM Tools and Technologies Folie 14: BIM Tools and Technologies Folie 15: BIM Tools and Technologies Folie 16: BIM Tools and Technologies Folie 17: BIM Tools and Technologies Folie 18: BIM Tools and Technologies Folie 19: BIM Tools and Technologies Folie 20: BIM Tools and Technologies Folie 21: BIM Tools and Technologies Folie 22: BIM Tools and Technologies Folie 23: BIM Tools and Technologies Folie 24: BIM Tools and Technologies Folie 25: BIM Utilization in the GTX Project Folie 26: BIM Utilization in the GTX Project Folie 27: BIM Utilization in the GTX Project Folie 28: BIM Utilization in the GTX Project Folie 29: BIM Utilization in the GTX Project Folie 30: BIM Utilization in the GTX Project Folie 31: Conclusion Folie 32: Q&A Folie 33: Thank you! Folie 34