Modellbased trainyard project in Norway
Agenda
• Quick about myself
• About the project Norway
• Structure in the project
• Modellbased no drawings
• Challenges
Quick about me
• Master in railway from NTNU
• 9 years experiance with trackdesign,
bim coordinator and bim manager for departement
• 3 years experience with digital lead for department contractor
Project organization
Owner group:
Work leader OCLWork leader track
Qavlity leader
Breem leader Documentation
Work leader substructor
Material order
Project leder BS
WORK leader coordinaotr
BIM leder Muzammil N Sheikh
Prosject leader
client
Ass project leder
Survey leader
Project owner
Client
Outdoor leader
Breeam Assesor
Project leader for signal, power,
VDC
Coordinatorer for Signal RISK leader
Design leder
About the project in Norway • Where is this
• Why are they building it
Hove train yard • Build 8 track with 16 train load capacity
• 4 km track, 23 turnout
• New technical building for supply the area
• New OCL line for the area Hove to Faaberg
• 7 km OCL, 110 OCL pole with mast, 9 brackets for cateneary
• Voltage for supply
• Communication system
• New signal system
Modell based no drawings • Agreement on tender design no drawing
• Work with process with engineer and client
• Prep document that have qual path for modell based project
• BIM executive plan as dynamic
Flow for BIM modell
Challenges with BIM
• Super users on site
• Traning
• Basic level
• Same flow
•
Question?