Next Station: Collaboration for High-Speed Rail | Presentation

Next Station: Collaboration for High-Speed Rail | Presentation

Download the full presentation now.

Next Station: Collaboration for High-Speed Rail | Presentation

MAKE THE FUTURE OF RAIL

© 2024 Autodesk. All rights reserved.

Joao Guilherme Alves Correa

BIM Manager | Egis

Next Station: Collaboration for High- Speed Rail

Topics

1 Intro

2 Project

3 Process

4 Results

1.Intro

RA IL SUMMI T 20 24

Speaker

João Guilherme Alves Correa

TO REPLACE IMAGE:

1. Right-click image

2. Select Change Picture

3. Select From a File to choose an image

4. Credit image (if necessary)

Civil Engineer and BIM Manager - Egis

o Brazilian

o 15 years of experience in road/rail infrastructure projects

Joined Egis Group in 2018

o Egis Brazil - Latam (2018) - Head of BIM - BIM Manager

o Egis BL Transportation (2021) - BIM Manager

o Egis Service Line Intercity (2024) – BIM Manager

Working in major infrastructure projects in Europe and Middle-East

Favorite tools:

RA IL SUMMI T 20 24

Egis Group Key Numbers

RA IL SUMMI T 20 24

Egis Group Flagship Projects

2.Project

RA IL SUMMI T 20 24

High-speed railway in Middle-East Concept design stage

 Client/Location - CONFIDENTIAL

 Scope

o Greenfield project: 70km total

o 4 passenger stations

o 2 depots/maintenance centers

 Duration - 12 months

o Milestone 1: engineering analysis – 6 months

o Milestone 2: concept design – 3 months

o Milestone 3: bid documentation – 3 months

RA IL SUMMI T 20 24

High-speed railway in Middle-East Digital Requirements

 ISO 19650 compliant

o Follow-ups every 2 weeks

 Tools: Autodesk AEC 2024 version

 All disciplines are modeled

o Mix between LOD 200 and 100 as per BIM Forum guide

 Native and Open BIM formats Infrastructure design

Model Coordination

Bridges Design

RA IL SUMMI T 20 24

High-speed railway in Middle-East Project Organization

England – 1 Site Location

12 People - Architecture

France – 4 Site Locations

60 People - Alignment/Track/Road/Earthworks

- Bridges/Tunnels/Civils

- BIM Management

- Geotechnics Middle-East – 2 Site Locations

42 People - Front-office

- MEP

India – 2 Site locations

68 People - Utilities

- Landscape

- Tunnels

- Railway Systems

3.Process

RA IL SUMMI T 20 24

Collaborative Process Compliant with ISO 19650

Day to day production

Internal collaboration

Client collaboration

Final repository - PUBLISHED

RA IL SUMMI T 20 24

SUN MON TUE WED THU FRI SAT

W E

E K

1 WIP

Internal

Shared

W E

E K

2

WIP

Internal

Shared

Client

Shared

Collaborative Process Compliant with ISO 19650

NWD

NWC

Native

Native

NWC

Native Native Native Native Native Native

Native Native Native Native Native Native

RA IL SUMMI T 20 24

Collaborative Process Compliant with ISO 19650

Review Copy files to

Co py

files t o

Copy files to

WIP

Shared

Internal

Shared

Client

Final

Publication

 User-friendly: single process for all

types of files

 Validation gates (ISO 19650)

 Less expensive than Design

Collaboration for C3D and Revit

RA IL SUMMI T 20 24

Collaborative Process Compliant with ISO 19650

 Shared – Internal is the key folder

o Xrefs

o C3D data shortcuts

o Revit links

o Coordination models – NWF & NWC links

RA IL SUMMI T 20 24

Design production process Overview

© Egis

RA IL SUMMI T 20 24

Design production process Exchanging information between C3D and Revit

 DTM

 Designed Surfaces

 Beta

 Alignments

 Center Track

Alignments

 Corridor Solids

 Bridges’ NWC models

 Import C3D surfaces

 Beta

RA IL SUMMI T 20 24

Design production process Exchanging information between C3D, Infraworks and Navisworks

 NWC Model IMX file: DTM and Corridor Boundaries  FBX Model: MNT + Bings

Imagery

© Egis © Egis © Egis

RA IL SUMMI T 20 24

Design production process Clash detection using Navisworks & ACC views

Rolling Stock x Station Walls & Track x OCS examples

& Coordination Add-in

RA IL SUMMI T 20 24

Design production process Syncing Navisworks and ACC

ApprovedIssues CheckApproved IssuesCheck

ADSK Coordination Add-in

© Egis

© Egis

RA IL SUMMI T 20 24

To go further ACC & PowerBI & SharePoint & ArcGIS → AU2024 sessions

4.Results

RA IL SUMMI T 20 24

Results End of milestone 2 results

© Egis© Egis© Egis

Coordination between C3D and Revit models

RA IL SUMMI T 20 24

Results End of milestone 2 results

-80% • Hours spent updating Coordination/Federated Models & MIDP:

Before 15h/week | After 3h/week

• Rework hours due to design changes in C3D:

-35% Average time spent in Alignment / Track /

Earthwork / Tunnels updates

Q&A

Thank You!

MAKE THE FUTURE OF RAIL

João Guilherme Alves Correa

joao.correa@egis-group.com

BIM Manager | Egis

Follow us! Join us! www.egis-group.com

Rail Summit 2024 Presentation Folie 1: Next Station: Collaboration for High-Speed Rail Folie 2: Topics Folie 3: 1.Intro Folie 4: Speaker Folie 5: Egis Group Folie 6: Egis Group Folie 7: 2.Project Folie 8: High-speed railway in Middle-East Folie 9: High-speed railway in Middle-East Folie 10: High-speed railway in Middle-East Folie 11: 3.Process Folie 12: Collaborative Process Folie 13: Collaborative Process Folie 14: Collaborative Process Folie 15: Collaborative Process Folie 16: Design production process Folie 17: Design production process Folie 18: Design production process Folie 19: Design production process Folie 20: Design production process Folie 21: To go further Folie 22: 4.Results Folie 23: Results Folie 24: Results Folie 25: Q&A Folie 26


Item Type: pdf