Implementing Autodesk Tandem as a Digital Twin Platform for More Sustainable Railway Operations & Maintenance | Presentation
Download the full presentation now.

MAKE THE FUTURE OF RAIL
© 2024 Autodesk. All rights reserved.
Implementing Autodesk Tandem as a Digital Twin Platform for More Sustainable Railway Operations & Maintenance
RA IL SUMMI T 20 24
Speakers
Ferdi TATARŞaban KUŞ
BIM & Visual Design Coordinator/Metro IstanbulDigital Twin Project Executive/Metro Istanbul
He is working as a BIM and Visual Design Project Coordinator at Metro Istanbul. He works on digital transformation projects with his team. Especially last two years, they have focused their work on implementation
of Digital Twin in Istanbul rail system lines.
He has been working as an Electrical and Electronics Engineer at Metro Istanbul since 2017. Also he has been working as a digital twin project executive in rail systems for the last two years.
Bio Bio
RA IL SUMMI T 20 24
18 Lines
241,25 km
235 Stations Underground, Elevated
Tram
10 Metro
4 Tram
2 Funicular
2 Cable Car
Metro
Operations
3 Million Passengers
221.784 Equipment
Network
RA IL SUMMI T 20 24
Lines in Operation
TOTAL 235 2.869.435 1015
Yenikapı-Atatürk Havalimanı-Kirazlı Metro
Yenikapı-Hacıosman Metro
Bakırköy-Kayaşehir Metro
Kadıköy-Sabiha Gökçen Havalimanı Metro
Üsküdar-Samandıra Metro
Levent-Boğaziçi Ü./Hisarüstü Metro
Mecidiyeköy-Mahmutbey Metro
Bostancı-Parseller Metro
Ataköy-Olimpiyat Metro
Kabataş-Bağcılar Tram
Kadıköy-Moda Tram
Topkapı-Mescid-i Selam Tram
Cibali-Alibeyköy Tram
Funicular
Cable car
23
16
19
23
20
4
17
13
14
31
11
22
14
4
4
26,8
23,49
26,7
33,5
26,5
3,3
20
14,3
17,2
19,3
2,6
15,3
10,1
1,44
0,72
569.418
617.114
88.545
349.402
277.043
25.273
182.840
46.478
24.160
488.964
4.052
206.708
26.772
31.389
9.467
105
182
80
144
150
12
80
40
20
92
6
82
30
6
8
Line Km Station Passenger Vehicle
241,25 km
RA IL SUMMI T 20 24
Maintenance Services
Vehicle, Railroad,
Electric, Electronic, Electromechanic,
Facility
Maintenance & Revisions
Technical
Our Fields of Activity
Operational Services
Traffic Management
Operation Planning Station Services
Management of
Commercial Spaces
Engineering & Consulting Services
Transportation &
Feasibility Study Architecture & Route Design
Control and Consultancy
Infrastructure Revision & Renovations
R&D and Design Systems Engineering
Operation Project – R&D
Agenda example
1 BIM in Metro Istanbul/IMM
2 Operational Processes and Challenges
3 Digital Transformation in Operational Processes
4 Digital Twin Case Study with Autodesk Tandem
5 Benefits of Digital Twin
BIM in Metro Istanbul/IMM
RA IL SUMMI T 20 24
Metro Istanbul/IMM manage BIM processes with
its own teams during the tender design and
operation phases and with its stakeholders during
the construction phase.
Design, Build, Operate
im age credit by derricksteven
RA IL SUMMI T 20 24
Documentation
Design
Design
Document Management & Project Coordination Clash Detection & Management
RA IL SUMMI T 20 24
Line Lenght : 20 km Number of Stations : 17
Build
RA IL SUMMI T 20 24
Operate
We aim to operate stations with BIM throughout
their lifecycle.
im age credit by Autodesk
Operational Processes and Challenges
RA IL SUMMI T 20 24
Operational Processes
SIGNALIZATION
SCADA
ERP
MAINTENANCE
OPERATION CONTINUITY
RA IL SUMMI T 20 24
Operational Challenges
18 Rail Lines 235 Stations
2000+ Escalators 600+ Elevators
SCADA
The station operator sees the equipment failure through SCADA
ERP
Operator opens the fault request via ERP
MAINTENANCE
Maintenance team repairs the equipment
MAINTENANCE PROCESSES FLOW
RA IL SUMMI T 20 24
Operational Challenges
Train Traction Energy Consumption Cost Station Auxiliary Power Energy Consumption Cost
• Traction Transformers
• Rectifiers
• Catenary System
• Train Performance
• Auxiliary Service Transformers
• Low Voltage Systems
• Lighting Systems
• HVAC Systems.
Digital Transformation in Operational Processes
RA IL SUMMI T 20 24
Digital Transformation in Operational Processes
(Metro Istanbul BigData)
Signalization(
Passenger Information Systems)
Energy
Management Systems
ERP
SCADA Systems
Tandem Connect
Digital Twin Case Study with Autodesk Tandem
RA IL SUMMI T 20 24
Digital Twin in Metro Istanbul
Metro Istanbul aims for a seamless transition from construction to operation and maximum operational efficiency with the digital twin
project.
RA IL SUMMI T 20 24
Objectives and Outcomes
Managing Assets
Efficiently
Access to asset parameters,
maintenance documents, and maintenance plans
Classify assets according to facility needs
Monitoring All
Systems on a
Single Platform
The ability to monitor all
systems in railways during operation from a single platform anytime and
anywhere.
Centralization of data
Achieving
Operational
Efficiency
Reduce Downtime
Saving Energy Cost
Reduce Maintenance Time
More Sustainable Operation
RA IL SUMMI T 20 24
Connecting IT/OT systems
We can access our database and manage our data with
Tandem Connect.
RA IL SUMMI T 20 24
Case Studies
• Escalator Operation Status and Performance Analysis
• Elevator Performance and Energy Analysis
• Train Performance Analysis
• External Environment Analysis
• HVAC Analysis and System Tracing
RA IL SUMMI T 20 24
RA IL SUMMI T 20 24
RA IL SUMMI T 20 24
RA IL SUMMI T 20 24
RA IL SUMMI T 20 24
Benefits of Digital Twin
RA IL SUMMI T 20 24
Managing Assets Efficiently
RA IL SUMMI T 20 24
Monitoring All Systems on a Single Platform
Train Performance
Equipment Status and Behaviours
Heatmaps Energy Consumption
RA IL SUMMI T 20 24
Achieving Operational Efficiency
Noise Level
Operational Speed
Combined Chart Data
RA IL SUMMI T 20 24
Achieving Operational Efficiency Reduce Downtime and Maintenance Time
RA IL SUMMI T 20 24
Achieving Operational Efficiency
Train Velocity – Regenerated Energy Related Chart
Train Acceleration-Consumed Energy Related Chart
RA IL SUMMI T 20 24
Achieving Operational Efficiency
Elevator Power Consumption Combined Chart
Power Consumption Distribution Charts
RA IL SUMMI T 20 24
Roadmap
2023 Q2
Descriptive Twin
Collecting Data Research
Determining the BIM model
needs of the lines
Determining objectives and
outcomes
2023 Q4
Informative Twin
Integrating BIM models in Tandem
Creation of facility management
template
Saving archive data from our
systems
PoC Analysis for operational
efficiency
2024 Q4
Predictive Twin
Collecting data in a large database (BigData Project)
Integrating near-real-time data
with Tandem Connect
Observation of graphs
according to their threshold
levels
State analysis of equipments
Examining energy consumption values
2030+
Future Goals
Creation of BIM models of all existing stations
Apply digital twin for all stations
Effective use of digital twin
application by maintenance and
operation units
Achieving more sustainable
metro operations on all our
lines
RA IL SUMMI T 20 24
Verdantix maturtiy model in Autodesk
Goals in 2030
We aim to achieve up
to a 37.5% increase in
operational efficiency
and to save up to 25%
in energy
consumption and
maintenance costs.
Roadmap
2023 Beginning of Digital Twin Works
Thank you!
BIM & Visual Design Coordinator
ferdi.tatar@metro.istanbul
www.metro.istanbul
Ferdi TATAR Digital Twin Project Executive
saban.kus@metro.istanbul
www.metro.istanbul
Şaban KUŞ
Q&A
Rail Summit 2024 Presentation Folie 1: Implementing Autodesk Tandem as a Digital Twin Platform for More Sustainable Railway Operations & Maintenance Folie 2: Speakers Folie 3 Folie 4 Folie 5 Folie 6: Agenda example Folie 7: BIM in Metro Istanbul/IMM Folie 8 Folie 9 Folie 10 Folie 11 Folie 12: Operational Processes and Challenges Folie 13 Folie 14 Folie 15 Folie 16: Digital Transformation in Operational Processes Folie 17 Folie 18: Digital Twin Case Study with Autodesk Tandem Folie 19 Folie 20 Folie 21 Folie 22 Folie 23 Folie 24 Folie 25 Folie 26 Folie 27 Folie 28: Benefits of Digital Twin Folie 29 Folie 30 Folie 31 Folie 32 Folie 33 Folie 34 Folie 35 Folie 36 Folie 37: Thank you! Folie 38: Q&A