Beyond Visualization BIM Models: Advancing Railway Design and Construction through Data Utilization | Presentation

Beyond Visualization BIM Models: Advancing Railway Design and Construction through Data Utilization | Presentation

Download the full presentation now.

Beyond Visualization BIM Models: Advancing Railway Design and Construction through Data Utilization | Presentation

MAKE THE FUTURE OF RAIL

© 2024 Autodesk. All rights reserved.

Beyond Visualization BIM Models:

Advancing Railway Design and

Construction through Data Utilization

RA IL SUMMI T 20 24

・15 years with JR East as Engineer of Civil ・2 years with JR East Consultants Company ・2 years with Railway Technical Research Institute ・Promote BIM of JR East since 2023

Position / Deputy Manager

NAOTO YOSHIDA

Position / Chief Staff

YUICHIRO TAKEDA

・8 years with Construction Company as Engineer of Architectural with BIM ・Promote BIM of JR East since 2023

Speaker

Agenda

 Introduction

 JRE-BIM

 Use Case of JRE-BIM Initiatives

 The Future of JRE-BIM

Introduction

RA IL SUMMI T 20 24

Stations

Passenger Line network

Employees

1,681(with BRT)

7401.2km(with BRT)

46,051 Ave. passengers 14.6 million/day

Ave. trains 11,883/day

Metropo litan area

Established in 1987 after privatization and separation of

the Japanese National Railways.

(as of 1st April 2023)

About JR East

Covers Tokyo and 16 prefectures

RA IL SUMMI T 20 24

2022FY consolidated operating

revenue

1.98trillion JPY

Transportation

65%

Others 35%

About JR East

Mobility

Transportation

(Railway, Monorail,

Bus, Cleaning service,

Railcar manufacturing,

etc.)

Retail & Services

(Retail sales,

Restaurant,

Advertising,

Publicity, etc.)

Real Estate &

Hotels (Shopping center,

Office building,

Hotel, Development

and sales of real

estate, etc.)

Others

(IT & Suica, Credit

card, System

development, etc.)

Lifestyle Solutions

Point Service (Integration of each business)

RA IL SUMMI T 20 24

Tokyo Metropolitan

Population Decline:

Population -30% by

2040 in Tohoku

region

Japan

Tohoku

JRE Area

Environment Surrounding JR East

Decrease in Mobility

needs: Work Style

Changes and

development of the

Internet society

RA IL SUMMI T 20 24

JR East Vision "Transformation 2027

RA IL SUMMI T 20 24

JRE-BIM

RA IL SUMMI T 20 24

Common Data

Environment

BIM Model

Facilities

Point cloud

data

JRE

Cloud

Semi-automated comparison of

future plans and calculation of estimated construction costs

Risk resolution of

inconsistencies between drawings and design

calculations

Design

Semi-automated

calculation of quantities and construction costs

Orderi

ng

Reduction of forms and

Automation of Determination Work

Constr

uction

Centralized

data from construction to maintenance

phase.

Mainte

nance

Plan

RA IL SUMMI T 20 24

JRE-BIM

Launch-BIM Cloud (Sharing Service)

2016

Start-Trial BIM modeling

✓ Mandatory with BIM Cloud for all Projects

✓ Mandatory with 3D laser scanner for surveying

Start-Trial Electronic contracting

✓ Mandatory-BIM Modeling in Design for all

Projects ✓ New company

“CalTa” is established

✓ Trial-Drawing cutout fore BIM model

✓ Launch-Inspection using Point cloud data

✓ Start Trial-3D Construction Photos

✓ Launch-TRANCITY

2017 2018

✓ Launch-JRE-BIM Guidelines

✓ Mandatory-Electronic contracting and delivery

Mandatory- Inspection using Point cloud data

2019 2020 2021 2022 2023

RA IL SUMMI T 20 24

Use Case of JRE-BIM Initiatives

Realization of early availability of new railroad

station platforms using BIM by urban areas

RA IL SUMMI T 20 24

Examples of JRE-BIM Initiatives

Plan overview

design order constructiondetail design

28 months 47 months

22 months

Plan overview・ detail

design order construction 13 months

40 months

Shortened by 7 monthsShortened by 6 months

RA IL SUMMI T 20 24

3Dization of existing buildings using point cloud data

Point Cloud 3D Models

RA IL SUMMI T 20 24

Confirmation of visibility from the crew's point of view

New Home

Existing Home

RA IL SUMMI T 20 24

Use Case of JRE-BIM Initiatives

Special

high-voltage cables

Reproduce positions from point cloud data

ensuring separation

Newly constructed

viaduct

Special high-voltage cables

RA IL SUMMI T 20 24

Overall construction planning with BIM model

Construction planning using BIM models

RA IL SUMMI T 20 24

Utilization of BIM model at the time of installation of penetrating steel

bars (penetrating steel bars: 268)

Handy scanner creates 3D models Overlaying 3D model of existing viaduct and through-bar

Use Case of JRE-BIM Initiatives

RA IL SUMMI T 20 24

Linkage between BIM models and structural analysis

RA IL SUMMI T 20 24

JRE-BIM Vision and Initiatives

Beyond Visualization BIM Models

Advancing Railway Design and Construction through Data Utilization

RA IL SUMMI T 20 24

Creation of 2D drawings from BIM models

STEP1

(2D Drawing+BIM)

STEP2

(BIM+ Detailed Drawing)

STEP3

(Full-BIM)

Current Steps Immediate goals

General

Arrangement Drawings(2D)

Detailed

Drawing(2D)

BIM BIM BIM

General

Arrangement Drawings(2D)

General

Arrangement Drawings(2D)

Detailed

drawing(2D)

Detailed

Drawing(2D)

cut out as necessary

detailed information

addition

cut out as necessary

cut out as necessary

RA IL SUMMI T 20 24

Linkage between BIM models and structural analysis

BIM Model

intermediate file

Structure

ShapeReinforcement informationMaterial

properties, etc.

Frame analysis software (ISAS)

Frame analysis software (DARS)

RA IL SUMMI T 20 24

Cost linkage from BIM models

Quantity and type

23.17.14.04.D

・Rebar type ・Weight

・Construction conditions (daytime/nighttime) ・Construction conditions (normal/poor), etc.

BIM Model

in-house system

Construction conditions

Classification Code

・Application Category ・Steel Type, etc.

intermediate

file

IFC

in the future

・unit price ・manufacturing process,etc

RA IL SUMMI T 20 24

Productivity Improvement in Railway Facility Inspection

RA IL SUMMI T 20 24

①Automatic 3D generation from

video data taken with your

favorite device ② Automatic placement on a three-dimensional digital

map base

③ Time series information

management

point cloud

3D Image

Upload

Time series bar

Automatically create point clouds by uploading video and still images to the cloud

“3D Point Cloud in the Cloud”

3D Point Cloud:TRANCITY

RA IL SUMMI T 20 24

Measurement by ground

laser scanner, etc.

3D Information

Document Information

Documentation information such as material certification

Captured by camera, etc.

→ Point cloud and 3D

Productivity Improvement in Railway Facility Inspection

3D point cloud platform

JRE Cloud

Link

CDE

RA IL SUMMI T 20 24

Examples of records of finished shapes and dimensions

Reinforced Concrete Work Example of Record of Reinforcement Status

Image of records by point cloud and 3D image

Link

RA IL SUMMI T 20 24

Efforts toward Labor-Saving Reinforcement Inspections

GoPro

TOMOROBO

Installation status

Shooting situation

RA IL SUMMI T 20 24

3D to not only the upper rebar, but also the lower rebar and

shear reinforcement rebar

Point cloud generated by SfM

Example of point cloud generated by TRANCITY

RA IL SUMMI T 20 24

(a) Upper reinforcement bar (b) Upper main rebar

(c) Lower reinforcement bar (d) Lower main rebar

(d) Stirrup (1)

(e) Stirrup (2)

Point cloud generated by SfM

Point Cloud Data

Modely

Service that enables modeling of reinforcing bars, etc. from point

clouds on a web browser

Provided by DataLabs, Inc.

RA IL SUMMI T 20 24

Reduction of forms and Automation of Determination

Point cloud of local

construction conditions

Semi-automatic generation

of BIM models

Design BIM Model

Labor-saving inspections through automatic

matching of information

IFC Modely

RA IL SUMMI T 20 24

Overview of the 3D Printing Bench Project

Image of the approach (with a view to applying the approach to actual structures)

STEP1

Benches, etc.

STEP2 station building

STEP3 civil engineering structure

In conjunction with new station building construction

Printed benches and waist walls

Virtual design of 3DPT station building for reconstruction

of a small local station

Application to Civil Engineering Structures Extracting

issues for application to civil engineering structures

Due to the many technical challenges,

JSCE and the JSCE are working together to tackle these issues.

BIM Model

I want to print directly from

the BIM model.

RA IL SUMMI T 20 24

Two benches to be installed in conjunction with the new station construction

were fabricated using 3D printing technology.

outside bench inner bench

Overview of the 3D Printing Bench Project

RA IL SUMMI T 20 24

Study for design realization

Fear of brittle fracture when breaking

in the design draft.

Generative design for additional reinforcement members (Courtesy of Autodesk)

Modified to printable (laminated) design

RA IL SUMMI T 20 24

Installation (2022.10), start of service (2022.12)

Installation statusSimulation of Load Carrying Capacity

Cita tion. 3Dコンクリートプリンティングの産学連携デザインコンペを開催 | 東京大学 (u-tokyo.ac.jp)

Coordinator: Autodesk

https://www.u-tokyo.ac.jp/focus/ja/articles/z0104_00978.html

RA IL SUMMI T 20 24

2016

2024

2027 Transformation 2027

Start of JRE-BIM initiative

Summary

Current location

Common Data

Environment

BIM Model

Facilities

Point cloud

data

JRE

Cloud Design

Orderin

g

Constru

ction

Mainten

ance

Plan

RA IL SUMMI T 20 24

Thank you!

NAOTO YOSHIDA

YUICHIRO TAKEDA

Rail Summit 2024 Presentation Folie 1: Beyond Visualization BIM Models: Advancing Railway Design and Construction through Data Utilization Folie 2: Speaker Folie 3: Agenda Folie 4: Introduction Folie 5 Folie 6 Folie 7 Folie 8 Folie 9: JRE-BIM Folie 10 Folie 11: JRE-BIM Folie 12: Use Case of JRE-BIM Initiatives Folie 13: Examples of JRE-BIM Initiatives Folie 14: 3Dization of existing buildings using point cloud data Folie 15: Confirmation of visibility from the crew's point of view Folie 16: Use Case of JRE-BIM Initiatives Folie 17: Construction planning using BIM models Folie 18: Use Case of JRE-BIM Initiatives Folie 19 Folie 20: JRE-BIM Vision and Initiatives Folie 21: Creation of 2D drawings from BIM models Folie 22: Linkage between BIM models and structural analysis Folie 23: Cost linkage from BIM models Folie 24 Folie 25 Folie 26 Folie 27: スライド 2 Folie 28: Efforts toward Labor-Saving Reinforcement Inspections Folie 29: スライド 2 Folie 30: スライド 2 Folie 31: Reduction of forms and Automation of Determination Folie 32: Overview of the 3D Printing Bench Project Folie 33: Overview of the 3D Printing Bench Project Folie 34: Study for design realization Folie 35: Installation (2022.10), start of service (2022.12) Folie 36 Folie 37: Thank you!


Item Type: pdf