Heathrow-Intro-CA24.pdf

Heathrow Airport Introduction
Nigel Stroud Principal Digital Asset Data Lead Heathrow
Robert Fitzjohn Digital Integration Manager Heathrow
Classification: Internal
02/10/20242
DIGITAL ASSETS
Connected Airport 2024
Nigel Stroud
Robert Fitzjohn
Classification: InternalHEATHROW PAST AND PRESENT
Classification: Internal
02/10/20244
INFORMATION MANAGEMENT TEAMS
Digital Asset Delivery Asset Handover &
Assurance Asset Information
Capital Delivery Engineering & Operations
Classification: Internal
02/10/20245
DIGITAL ASSET EVOLUTION
First EIRs
First Digital Asset Vision
CDE Design CDE Deployment
Refreshed Standards
2015 2016 2017 2018 2019 2021 2022 2023 2024
PMO Digital Toolkit
Digital Roadmap Published
CDE Trial
Common Language
&
CDE concept
Genesis
Consolidated Training
2000
Classification: Internal
Developing our Digital Asset Vison
• 6 programmes coving a wide range of our assets.
• Building supply chain relationships.
• Energy level for change.
• Building an organisation to fit our priorities.
• Data driven airport, enabled by a digital ecosystem
• Next generation ready, interacting with information as we do socially
• Automated information delivery allowing us to focus on assuring completeness and quality
• Keep Innovating, being aware of legacy, but do let it block change.
• Just digitising a process is not enough, we need to re-think how we
get to our outcomes
• Reimagine how activities should be undertaken. A robust Information
Management approach is key to our change
Perfect Time for Change
Our Approach
Data Driven
Classification: Internal
02/10/20247
IT’S ALL ABOUT THE DATA
Examples of components with unique codes
Airport, Runway, Stand, Building
Building /Infrastructure level
Room, baggage hall
Electrics, Heating, ventilation
Smoke detector, FEGP, Chiller Unit
Data ModelCommon Language - Data Structure and Classification
Classification: Internal
02/10/20248
DIGITAL PRINCIPLES
In 2021 the
Classification: Internal
02/10/20249
WHY CHANGE
Time is wasted checking information is correct as its integrated into our systems
Loosing data intelligence by simplifying as we integrate into our systems.
Information exchanges are file based, transactional and can be unsecure. e.g. emails and third party systems. The lack of best practice information management leads to a lack of trust of information.
Colleagues in operations find it difficult to locate good quality and timely data due to end of life systems and outdated processes that are unresponsive to change.
Information silos on multiple disconnected systems creates delays in decision making and obstructs collaborative working.
Time and money is wasted resurveying information due to the mismanagement of information and lack of visibility.
Safety knowledge, trends and lesson learnt are not captured and lost in different systems
Classification: Internal
02/10/202410
TRADITIONAL DELIVERY APPROACH
Lack of
trust
Project delays
from outdated
information
Information Exchange
Information Maturity
Operate and
Maintain
Loss of
Quality
Incomplete Hard to
find
Disconnected
Poor control
and visibility
Re-survey
Gap
No early
governance
of controls
Wasted time
validating
Dumb down
Information
Unused value
Supply chain
Information
Design Build Operate
Project Gateways G3 G4 G5 G6 G7 G8G2
G1
Non
conformance
Unsecure
Behaviours
Supply Chain
Third parties
Heathrow Stakeholders
Classification: Internal
02/10/202411
COLLABORATIVE DELIVERY APPROACH
Third parties
Information Exchange
Information Maturity
Operate and
Maintain
Consistent approach
Intuitive interfaces
Connected
Automating asset integration
Shared Ownership
Embodied Carbon
Safety Risk Trends
Heat Maps • Carbon • Performance • Status and Interfaces
Requirements embedded into
Contracts Digital
Rehearsals
Virtual condition
monitoring
Design Build Operate
G3 G4 G5 G6 G7 G8G2 G1
Operational Readiness
Heathrow Stakeholders
Decisions
Supply Chain
Project Gateways
Residual Safety Info
Classification: Internal
02/10/202412
PLANNING CHANGE
Asset Management
and Digital Strategies
Digital
Roadmap
Tangible Activities
Outcomes Measurable
Benefits
User Cases
Known Challenges
Classification: Internal
02/10/202413
ROADMAP DEVELOPMENT
Page 2Heathrow Digital Asset Data Strategy
Phase 1: Alignment to Heathrow Data Strategy 2023+
Process Organisation Information Technology
P1 – Strengthen asset data governance
P2 – Establish standard core digital IM
processes
P3 – Enhance asset info and data standards
Q1 – Create IM principles and behaviours
Q2 – Assess internal and supply chain digital
capability
Q3 – Design and implement awareness training programme
Q4 – Create asset management steering
group and governance
I1 – Define the key components of the master data model
I2 – Update and implement digital HAL
gateway
I5 – Embed digital asset info reqs into contracts
I6 – Review and enhance information
security model
T1 – Define enhancements to asset data systems
T3 – Develop the brief for mobile IT
solutions
T4 – Conduct SMART assets assessment
T5 – Create roadmap governance toolkit
M o
n th
s 1
– 6
Solut ion BenefitsProblem Future
Realising the full potential of data
Data Specification
Clear data
requirements
Classification: Internal
02/10/202414
INTEGRATED ROADMAP
Need
How
What
Classification: Internal
02/10/202415
ROADMAP ACTIVITIES
Classification: Internal
02/10/202416
EXPLOITING VALUE FROM DIGITAL ASSETS
Safety Risk Cost
Planning
Embodied
Carbon Digital
Rehearsals
Project
Status
Remote
inspections
Real time data
Project
Performance
Consistent
approach
Reduced
Rework
• Automating information delivery with clear processes and technology to safeguard and exploit value.
• Creating an environment where we all trust the information, allowing us to have confidence to make excellent decisions
Classification: Internal
02/10/202417
FINANCIAL VALUE TO DIGITALISATION AND INFORMATION MANAGEMENT
We recently took part in a study run by KPMG and Atkins into the Value of Information Management. A number of other clients contributed, and the final report was issues to the ‘Centre of Digital Built Britain’ who published. Click here for full report.
We used data from the Cargo Tunnel project to highlight how new information Management approaches created monetary benefits during early design.
For Heathrow benefits were identified from:
• Reduced project or programme delivery timetable
• Enabling Design for Manufacturing and Assembly
• Supply chain outperform the client’s original requirements
• Workforce health and safety including fire
• Constructability and coordination issue resolved virtually
For Heathrow, Use of IM across our capital delivery programme is
expected to unlock cost savings of some £7.40 for every £1
invested in IM.
IM Foundations are
key to enable Digital
transformation
https://www.cdbb.cam.ac.uk/files/cdbb_econ_value_of_im_report.pdf
Q&A