Autodesk-Intro-HeathrowCA24.pdf

Autodesk-Intro-HeathrowCA24.pdf

Autodesk-Intro-HeathrowCA24.pdf

WELCOME TO THE UNITED KINGDOM

ABOUT ME ▪ Autodesk Global Business Development

▪ Degree in Architectural Technology

▪ Expertise across BIM Management in Design, Construction & Operations

▪ Previously BIM Lead & Asset Information Manager at Gatwick Airport, London

▪ Enterprise roll out and management of Autodesk Platform, integrating people, process and technology across 150+ CAPEX in a live operational environment

▪ BSI Committee Member for ISO 19650 Guidance & Transition

▪ Co-Founder & Chair of ‘Connected Airports’

▪ BuildingSMART UK&I Airport Domain Lead & International steering committee member

Lewis Watts Autodesk

Contact: E-mail: Lewis.watts@Autodesk.com

Mob: +447584382639

mailto:Lewis.watts@Autodesk.com

© 2024 Autodesk. All rights reserved.

Connected Airports London, UK ‘24 Realizing the future of London Heathrow

Lewis Watts Connected Airports Lead & Global Business Development, Autodesk

Image credit: LaGuardia†Gateway†Partners© 2024 Autodesk. All rights reserved.

CONNECTED AIRPORTS - A GLOBAL COMMUNITY -

265 MEMBERS

164 AIRPORTS

>2BN PASSENGERS

Join the community LINK

https://www.linkedin.com/groups/9152175/

Connected Airports  Group founded in 2017

 Driven by a small steering committee of Airport Owners

 In-person events with Global airport community

 Industry focus group for airport owner peer-to- peer knowledge share and collaboration

 Industry leaders to share best practise and support other airports on their journey

 Opened to a global audience and establishing a unrivalled digital aviation network of like minded executives

2015 2020

JUST INTERESTED

BEGAN EXPLORING BIM

33%

17% 11%

11%

28%

INTEGRATING PROCESSES

COMPLETING BIM PROJECTS

REALIZING BENEFITS 11%

JUST INTERESTED

BEGAN EXPLORING BIM

INTEGRATING PROCESSES

COMPLETING BIM PROJECTS

REALIZING BENEFITS

14% 32%

29%

15%

FAA BIM ADOPTION STUDY

2023 LOOK BACK

Connected Airports Iceland [Theme: Delivering the future of Keflavik Airport]

 SVEINBJÖRN INDRIÐASON CEO ISAVIA welcomed the group by sharing inspiring keynote.

 24 delegates attended from 5 European airports.

 95% attendees gave positive feedback from in person attendance

 Summary of event: Airport expansion project behind the doors site tour as delegates got to see how Digital technologies is helping build the airport in one of the most challenging terrains in the world.

 Viking restaurant and Axe throwing experience, also included a glimpse at the Northen Lights…

Connected Airports AU Las Vegas [Connecting Global Airports at Autodesk University]

• Airport executives attending AU joined us for a scrumptious meal at Gordan Ramsay Hell Kitchen

• With great conversation and a room of international experts this meet ups are deemed highly valuable for future development and networking

• We were also lucky enough to have a special visit from Gordon Ramsay himself

• Representation from the following Airports.

Full Name Company Name

Lewis Courtnell Amazon

Michael LaFontaine County of Orange

Jean-Manuel LeJeune Dublin Airport Authority

Ben Romero Denver International Airport

Brendan Dillon Denver International Airport

Michael LaFontaine Denver International Airport

Robert Brown DFW Airport

Jelber Prado Houston Airport System

Johannes Bjarnason Isavia

Pall Palsson Isavia

Frank Peters LAWA

Yelsin Huancachoque Lima Airport Partner

Christopher Cedillo Los Angeles World Airports

Fernando Mendez Diaz Los Angeles World Airports

Oscar Tolama Los Angeles World Airports

Amanda Coleman Port of Portland

Boyka Georgieva Port of Seattle

Chris Rouse-Riley Port of Seattle

Liliana Martinez Port of Seattle

Guy Michael San Francisco International Airport

So what's next?

Agenda – Day 1 (am) Heathrow

1. Welcome and Introduction Welcome to Connected Airports – London, UK Lewis Watts, Global Aviation Lead, Autodesk

2. Heathrow Infrastructure H7 Investment 15 min overview Pete Waddingham, Head of Infrastructure Delivery, Heathrow

3. T2 Baggage Programme overview 15 min overview Alicia Mouriz Guerrero, T2 Baggage Programme Lead, Heathrow

4. Heathrow Airport Introduction Heathrow overview, project insights, status and Team introductions Nigel Stroud, Principal Digital Asset Data Lead, Heathrow & Robert Fitzjohn, Digital Integration Manager, Heathrow

5. COFFEE & CONVERSATION

Agenda – Day 1 (am) Heathrow

6. Introduction to Costain's role at Heathrow Costain with detail their role at Heathrow as a delivery partner, Maintaining and updating assets, ensuring efficient operations through digital rehearsals. Explaining how they have been addressing industry challenges, intelligent work planning in live environments, benefits of the "When and Where" tool, and transforming spreadsheets into 3D models with VR. Andy Clark, Integrated Transport Director, Costain & Ruth Fuller, 4D Visualisation Planner, Costain

7. Networking Lunch

Agenda – Day 1 (pm) Heathrow

8. Project Tours – T2 Baggage+ Live project site tours in both the landside and airside internal spaces, hosted by Costain Aidan Marchetti, Heathrow Works Manager, Costain

9. Day 1 – Wrap up Summary, closing comments and remaining agenda overview. Lewis Watts, Global Aviation Lead, Autodesk

10. 5pm Transfer back to Elvetham Hotel

11. 19:30 Dinner @ Sylvanus Restaurant, The Elvetham

Event logistics

Transportation

All transportation to and from Elvetham Hotel, and Heathrow Airport has been arranged. Transfers back to the airport post event shall be provided at 16:30 on Thursday afternoon, please speak to Lewis or Hemang if you require alternative times.

Questions

Time will be made available at the end of each session for questions to be asked, but we do encourage networking, questions and sharing throughout

Site access & PPE

- Hi-Viz is provided by Heathrow

- Health & Safety briefing inc.

- Airside & Site access has been prepared

Slide 1: WELCOME TO THE UNITED KINGDOM Slide 2: ABOUT ME Slide 3: Connected Airports London, UK ‘24 Slide 4 Slide 5: Connected Airports Slide 6: FAA BIM ADOPTION STUDY Slide 7: 2023 LOOK BACK Slide 8: Connected Airports Iceland Slide 9: Connected Airports AU Las Vegas Slide 10: So what's next? Slide 11: Agenda – Day 1 (am) Heathrow Slide 12: Agenda – Day 1 (am) Heathrow Slide 13: Agenda – Day 1 (pm) Heathrow Slide 14: Event logistics


Item Type: pdf